Skip to main content

Epiroc showcases innovative SB 1102 ‘Solid Body’ breaker

Epiroc’s new SB 1102 solid body breaker is said to possess an innovative ‘Solid Body’ design guaranteeing reliability and optimum uptime. Launched earlier this year and the heaviest of nine SB body breakers said to be ideal for civil engineering, trenching and construction and demolition customers, the 1.06 tonne attachment can be fitted to 13-24 tonne class excavators. The SB body breakers’ ‘Solid Body’ concept eliminates common parts to enable high durability and a slim, compact, lightweight design.
April 25, 2018 Read time: 2 mins
Christian Maggioni, Epiroc regional business line manager hydraulic attachment tools, with the SB 1102 solid body breaker

8737 Epiroc’s new SB 1102 solid body breaker is said to possess an innovative ‘Solid Body’ design guaranteeing reliability and optimum uptime.

Launched earlier this year and the heaviest of nine SB body breakers said to be ideal for civil engineering, trenching and construction and demolition customers, the 1.06 tonne attachment can be fitted to 13-24 tonne class excavators.

The SB body breakers’ ‘Solid Body’ concept eliminates common parts to enable high durability and a slim, compact, lightweight design. Christian Maggioni, Epiroc regional business line manager hydraulic attachment tools, said the concept was the first of its kind in global breaker manufacturing sector.

“It took a couple of years to develop the Solid Body concept, as from a metallurgy point of view it is not easy to make such a body,” said Maggioni. “The SB 1102 has fantastic reliability and power. It is not like a standard breaker. It is a great model for rental customers. We have had a lot of success with the SB body breakers, starting from the smallest one [weighing 55kg].”

Like the other SB solid body range breakers, the SB 1102 also has an energy recovery system that automatically utilises the piston recoil energy to reduce vibration levels, simultaneously increasing performance. Also aiding the breaker’s consistent performance and reliability is a claimed maintenance-free high-pressure accumulator with a patented diaphragm support.

For more information on companies in this article

Related Content

  • Komatsu introduces 3D machine guidance and payload functions for crawler and wheeled excavators
    April 5, 2024
    Drawing on a decade of experience and a deep understanding of the intelligent Machine Control system, Komatsu now offers Smart Construction 3D Machine Guidance kit as a simple and flexible technological enhancement for a broad range of standard Komatsu machines and mixed fleets.
  • Volvo CE’s committed to innovation despite tough global market
    April 12, 2016
    Volvo Construction Equipment is said to be demonstrating its commitment to innovation despite the tough global sales market. The Swedish construction and quarrying equipment giant has this week unveiled its 90tonne Tier 4 Final/Stage IV complaint EC950E hydraulic crawler excavator – the biggest hydraulic crawler excavator it has ever made - and its 55tonne A60H articulated hauler. “I’m very pleased to say that on the first day of the show, we were taking order on this,” said Martin Weissburg, presiden
  • Trio of manufacturers release cutting-edge hybrid excavators
    May 19, 2014
    A trio of leading global construction equipment manufacturers have released innovative hybrid excavators. Guy Woodford reports on the new models Hitachi Construction Machinery (Europe) has launched the first of a new generation of excavators, the ZH210LC-5 hybrid. The latest innovative Zaxis-5 model has been designed to deliver reliable performance with fewer emissions and less fuel than the ZX210-3 model.
  • Ferry operators sink the financing plan for Fehmarn Belt link
    December 17, 2018
    The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr