Skip to main content

Epiroc showcases innovative SB 1102 ‘Solid Body’ breaker

Epiroc’s new SB 1102 solid body breaker is said to possess an innovative ‘Solid Body’ design guaranteeing reliability and optimum uptime. Launched earlier this year and the heaviest of nine SB body breakers said to be ideal for civil engineering, trenching and construction and demolition customers, the 1.06 tonne attachment can be fitted to 13-24 tonne class excavators. The SB body breakers’ ‘Solid Body’ concept eliminates common parts to enable high durability and a slim, compact, lightweight design.
April 25, 2018 Read time: 2 mins
Christian Maggioni, Epiroc regional business line manager hydraulic attachment tools, with the SB 1102 solid body breaker

8737 Epiroc’s new SB 1102 solid body breaker is said to possess an innovative ‘Solid Body’ design guaranteeing reliability and optimum uptime.

Launched earlier this year and the heaviest of nine SB body breakers said to be ideal for civil engineering, trenching and construction and demolition customers, the 1.06 tonne attachment can be fitted to 13-24 tonne class excavators.

The SB body breakers’ ‘Solid Body’ concept eliminates common parts to enable high durability and a slim, compact, lightweight design. Christian Maggioni, Epiroc regional business line manager hydraulic attachment tools, said the concept was the first of its kind in global breaker manufacturing sector.

“It took a couple of years to develop the Solid Body concept, as from a metallurgy point of view it is not easy to make such a body,” said Maggioni. “The SB 1102 has fantastic reliability and power. It is not like a standard breaker. It is a great model for rental customers. We have had a lot of success with the SB body breakers, starting from the smallest one [weighing 55kg].”

Like the other SB solid body range breakers, the SB 1102 also has an energy recovery system that automatically utilises the piston recoil energy to reduce vibration levels, simultaneously increasing performance. Also aiding the breaker’s consistent performance and reliability is a claimed maintenance-free high-pressure accumulator with a patented diaphragm support.

For more information on companies in this article

Related Content

  • Barrier innovations making roads safer
    February 21, 2013
    Developments in barrier technology continue to make roads safer for drivers - Mike Woof writes. Innovative new barrier technology is helping make roads safer for drivers. Key developments have been made in barrier design, helping ensure road and highway infrastructure is more passively safe. New barrier designs ensure that errant vehicles are redirected into the roadway, with reduced risks for occupants and also other road users. Continuously slipformed concrete barriers reinforced with steel are now widely
  • Shell Bitumen’s new technology cuts air-polluting emissions by 40%
    May 15, 2019
    Shell Bitumen has developed molecular technology that cuts 40% of air-polluting emissions -Kristina Smith reports Shell Bitumen is launching a new technology which drastically reduces the amount of harmful air pollutants produced when asphalt mixes are manufactured and laid on the roads. Called Shell Bitumen FreshAir, it reduces six of the seven pollutants produced by at least 40%. The seventh, ozone, is produced in too small an amount to measure changes. “The World Health Organisation has said that 90%
  • IRF Geneva takes centre stage at Movin’ On event in Canada
    September 27, 2017
    The Challenge Bibendum organised by Michelin for the past 20 years had now become “Movin’On”. Organised in Canada on 13th-15the June 2017, in this new avatar and focus, the event had attracted 4,000 participants from the transportation industry from 31 countries around the world. IRF Geneva was represented by its executive director, Susanna Zammataro.
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un