Skip to main content

Engine rebuild options

The remanufacturing option from Cummins is available in three packages and is for engines with capacities.
By MJ woof November 12, 2024 Read time: 2 mins
Customers of Cummins in Europe can now opt to have their high power engines such as the QSK60 completely rebuilt at the firm’s facility in Krakow, Poland

Cummins invested US$10 million in its Master Rebuild Centre in Krakow, Poland. This has allowed European customers to arrange a rebuild or full-scale remanufacture of a high-power Cummins engine to original equipment standards, supported by the firm’s warranties.

The remanufacturing option is available in three packages and is for engines with capacities from 19-78litres that require more than a conventional in-chassis rebuild. “We now have a solution in Europe for every situation in the lifecycle of a high horsepower Cummins engine,” said Alan Routledge, Manager – New Business Start-up Leader.

Taking a proactive approach to engine maintenance can save customers on repair costs. At Krakow, Cummins offers three remanufacturing packages –Advanced, Ultimate and Ultimate SE (Service Exchange). Advanced has a standard bill of materials and warranty coverage to help keep the costs down for customers.

The next level up is Ultimate, which is a zero hour remanufacture where the life-to-overhaul expectation is the same as a brand new engine and the work is backed by a 12-month unlimited or two-year/2,000 hours warranty which may also include Cummins pro-rata policy coverage beyond warranty.

With Ultimate, the engine is completely dismantled and individual parts are cleaned with advanced tools, techniques and solvents to remove debris without degrading metal surfaces. All parts are inspected and replaced if necessary. Following reassembly, the engine is dyno-tested to ensure expected power and torque performances are met, along with in-test spectrum oil analysis.

Remanufacturing takes around 35 days and Routledge said, “It’s less expensive, and there’s an environmental benefit because remanufacturing requires around 85% less energy than manufacturing new engines.”  Attached to the Ultimate package, providing it is planned with at least four months’ notice, there is the option of a service exchange (SE) engine unit. There is a fixed price on the Ultimate and Ultimate SE packages on condition of the returned engine core being complete with no evidence of misuse.

For more information on companies in this article

Related Content

  • The new CX130D from CASE gets redesigned boom reduce stress
    January 6, 2017
    CASE Construction Equipment is raising the stakes in the utility sector with the launch of its CX130D crawler excavator, one of the manufacturer’s new generation D-Series crawler excavators. This utility machine has much in common with its larger cousins in the D-Series, such as CASE’s fuel-efficient Tier 4 Final (Euro IV) maintenance-free technology with no DPF. The spacious cab has a fully adjustable workstation with a new air-suspended high-back seat for added operator comfort. The pressurised and
  • Demand is changing in the bitumen market
    August 22, 2013
    The supply and demand for bitumen around the world is changing; refineries, suppliers and contractors must all make changes too - Kristina Smith reports These are interesting times for those supplying and buying bitumen. Almost every part of the picture is in flux: global demand is shifting dramatically; major suppliers are following demand; refineries are closing down or stopping production of bitumen. “In Europe and globally there is a very big chain of events happening,” said Bernd Schmidt, CEO o
  • Dynapac’s new future within the Fayat Group
    March 8, 2018
    Dynapac is now part of the Fayat Group and is a new sibling for fellow road machinery firm BOMAG - Mike Woof writes. The purchase of Dynapac from its previous owner, Atlas Copco, by the Fayat Group did generate some comment in the construction machinery sector. Dynapac, a long-standing player in the road machinery segment, is a rival to a firm that is already a key component in the Fayat Group, BOMAG. Both BOMAG and Dynapac make ranges of soil compactors, asphalt compactors, asphalt pavers and milling m
  • David Barwell suggests six steps for closing the UK funding gap
    January 11, 2019
    Six steps for closing the UK funding gap Plenty of private money is seeking UK investment opportunities. The government and the infrastructure sector in general must make projects more attractive, writes David Barwell* It is widely acknowledged that the UK faces mounting economic, environmental and social problems if the nation's infrastructure fails to meet present and future demands. Government estimates propose that almost €561 billion is required to bridge the infrastructure funding gap. As part o