Skip to main content

Emergency care in the UK

March 23, 2016 Read time: 1 min
Police in the UK stopped a speeding car only to discover the passenger was in the late stages of labour and being driven to hospital by her partner. Before the officers were able to decide what to do next, the woman began to give birth. The officers, having undergone first aid training, assisted. New mother and baby then made the journey together afterwards having come through this emergency unscathed.

Related Content

  • New IRF president takes up new role
    July 13, 2022
    IRF chose the International Transport Forum Summit (ITF 2022), hosted in Leipzig, to mark the start of the IRF Presidency of Anouar Benazzouz. Succeeding Bill Halkias who has concluded his three-year mandate at the helm of IRF, Benazzouz was elected unanimously as IRF president by the General Assembly on 29 March 2022 in Amsterdam.
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s
  • Eco-chase
    February 27, 2012
    Police in Poland were recently filmed at a training facility practicing interception techniques for car chases. However as a cost saving measure the police were instructed to push the vehicles and eliminate the expense of fuel. The police claim the measure is needed to trim budgets and has the added benefits of being environmentally friendly and keeping the force fighting fit. However critics have responded saying that as most criminals can afford fuel for their cars, training police to push vehicles is a t
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a