Skip to main content

Efficient recycling and soil stabilisation from Wirtgen

Wirtgen says that its latest WR recyclers/stabilisers are more efficient due to the development of the new Resource Efficiency System.
January 5, 2023 Read time: 1 min
Wirtgen WR 250i

This increases the degree of automation in the overall process, boosting working efficiency.

In addition, the new VARIO injection bar for binding agents allows the user to regulate the injection pressure of water and bitumen to achieve more homogeneous distribution in the mixing chamber.

The Resource Efficiency System combines an automatic steering system and digital project site documentation in a single app, improving the cost-effectiveness and resource-efficiency of soil stabilisation and recycling operations. The satellite-based guidance system allows precise and efficient completion of project tasks and steers the machine with precision measured in centimetres on the basis of a previously calculated reference cut and a predefined overlap of adjacent cuts. At the same time, location-specific parameters are recorded to generate a database for site analysis and documentation.

Parameters such as working width and depth, distance and area worked and fuel consumption are recorded. The system is scalable, which means that other machines such as rollers and compactors involved in the process can also benefit from the data.

For more information on companies in this article

Related Content

  • Efficient compaction
    January 17, 2023
    An innovative tool to help optimise surface quality after compaction is now being considered by BOMAG. There is a need for this technology to fill a gap in road construction work, according to the firm
  • App upgrades and power choices
    December 10, 2024
    New power options and app options are available for the crushing and screening segment
  • Stabilising ground with new plant at high altitude
    November 6, 2018
    XCMG recently constructed the third high-speed, stabilised soil mixing plant XC800S at high altitude on Qinghai-Tibet Plateau, the world's highest and largest plateau. The installation is for a project that forms part of China’s Grand Western Development and Belt and Road Initiative. This was a part of the demand for four cost-effective, high-speed stabilised soil mixing plants. To construct such a giant equipment on the plateau presented a huge challenge as the area has a harsh environment, with low temp
  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.