Skip to main content

Efficient construction management

Linarc says that it is offering a comprehensive, cloud-based construction project management software that can foster collaboration and efficiency for mid- to large- scale projects. The firm claims that its software can solve the daily challenges that owners, design teams, and contractors confront while driving projects to completion.
January 24, 2023 Read time: 2 mins
A new software system from Linarc is said to offer a comprehensive construction solution © Mikeaubry | Dreamstime.com

Linarc uses technology, integrated connectivity, intelligent data analysis, and real-time updates to give users the tools, resources, and information they need to perform at their best. As a result, projects run smoother; progress moves faster, and projects are completed on time and on budget, according to the company.

Linarc is a comprehensive project management solution that eliminates the need for multiple systems, with built-in features that provide everything a user needs to manage construction projects successfully in a single platform. In addition, Linarc is an open API and is said to integrate easily with standard project management solutions, ERPs, and other software for seamless accounting and transparency.

Linarc’s collaborative scheduling feature uses predictive analytics to allocate resources to individual tasks to eliminate delays and ensure on-time completion. It can link work crews, materials, and equipment to the schedule of values and updates progress in real-time.

The company says that project owners have clear insights into work progress and budget expenditures, while design teams are connected to project execution for problem-solving. Meanwhile, CFOs and procurement specialists have control of project financials. And management teams get detailed reports and reference dashboards to stay informed and on target. In addition, supervisors control work assignments and material deliveries for seamless workflows and sustainable progress, while field crews receive detailed work assignments with documents and photos.

Linarc can eliminate communication silos across a project portfolio, and the system’s analysis gives company leaders the leverage of combined resources across projects according to the firm.

For more information on companies in this article

Related Content

  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Wireless mapping, data logging and asset management
    February 24, 2012
    Topcon says that its advanced SiteLink technology provides a comprehensive information technology solution for equipment on construction sites. The SiteLink product is a wireless communications mapping, data logging, reporting and asset management package that can be used on off-highway equipment. According to Topcon the system can be used with any make, model or type of job site machine, regardless of manufacturer and age. The system can also pinpoint via GPS any make of equipment on a job site, serving as
  • Pay attention to The Ray, urges WheelRight’s John Catling
    July 17, 2017
    Development of the connected and sustainable highways is moving quickly in the US and the Far East but progress in Europe is much less impressive. One example of a connected highway that offers an interesting model for European transport planners and policymakers is The Ray, a 29km stretch of Interstate 85 in the state of Georgia. Originally established by a charitable foundation, The Ray offers an inspiring vision of a sustainable highway, even for the near future. Drivers crossing the state line from Ala
  • Brazilian roads benefit from upgrades with milling machines
    September 10, 2014
    Super-fine milling is a technique that has been used in Brazil to rehabilitate roads for the World Cup The rehabilitation work had to be carried out speedily and economically, while minimising traffic disruption. To meet these requirements, contractor Fremix Engenharia e Comércio has been using a Wirtgen W200 cold milling machine that is fitted with a super-fine milling drum.