Skip to main content

Efficient construction management

Linarc says that it is offering a comprehensive, cloud-based construction project management software that can foster collaboration and efficiency for mid- to large- scale projects. The firm claims that its software can solve the daily challenges that owners, design teams, and contractors confront while driving projects to completion.
January 24, 2023 Read time: 2 mins
A new software system from Linarc is said to offer a comprehensive construction solution © Mikeaubry | Dreamstime.com

Linarc uses technology, integrated connectivity, intelligent data analysis, and real-time updates to give users the tools, resources, and information they need to perform at their best. As a result, projects run smoother; progress moves faster, and projects are completed on time and on budget, according to the company.

Linarc is a comprehensive project management solution that eliminates the need for multiple systems, with built-in features that provide everything a user needs to manage construction projects successfully in a single platform. In addition, Linarc is an open API and is said to integrate easily with standard project management solutions, ERPs, and other software for seamless accounting and transparency.

Linarc’s collaborative scheduling feature uses predictive analytics to allocate resources to individual tasks to eliminate delays and ensure on-time completion. It can link work crews, materials, and equipment to the schedule of values and updates progress in real-time.

The company says that project owners have clear insights into work progress and budget expenditures, while design teams are connected to project execution for problem-solving. Meanwhile, CFOs and procurement specialists have control of project financials. And management teams get detailed reports and reference dashboards to stay informed and on target. In addition, supervisors control work assignments and material deliveries for seamless workflows and sustainable progress, while field crews receive detailed work assignments with documents and photos.

Linarc can eliminate communication silos across a project portfolio, and the system’s analysis gives company leaders the leverage of combined resources across projects according to the firm.

For more information on companies in this article

Related Content

  • Firmly in control with communications
    May 6, 2020
    An important step has been made with regard to improving data communications between construction machines
  • Leica iCON grade iGD4 increases dozer functionality
    January 6, 2017
    The Leica iCON grade iGD4 solution which enables one dozer to do multiple types of grading work with speed and accuracy was launched has been launched at Conexpo 2014. The highly accurate and efficient iCON grade iGD4 dozer solution calculates the lift, angle, and tilt of the dozer’s six-way blade. It allows operators to angle their blade while iCON grade’s advanced hydraulic control system automatically controls the blade’s lift and tilt. As a result, dozers can now be run at the full extent of their capa
  • Leica iCON grade iGD4 increases dozer functionality
    March 6, 2014
    The Leica iCON grade iGD4 solution which enables one dozer to do multiple types of grading work with speed and accuracy was launched has been launched at Conexpo 2014. The highly accurate and efficient iCON grade iGD4 dozer solution calculates the lift, angle, and tilt of the dozer’s six-way blade. It allows operators to angle their blade while iCON grade’s advanced hydraulic control system automatically controls the blade’s lift and tilt. As a result, dozers can now be run at the full extent of their capa
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap