Skip to main content

Efficient concrete testing technology available

Giatec is now offering the improved SmartRock mobile application with key upgrades.
February 8, 2021 Read time: 1 min

The firm says that this intuitive mobile app and user interface design offers contractors access to a more comprehensive analysis of concrete performance.

All the updates have been designed to cope with the fast-changing environment on construction jobsites by speeding up and improving the ease of collection and analysis of concrete data. With these upgrades, SmartRock users can now activate multisensor processing options that allow them to automatically connect to every embedded sensor within range and download data all on one page within the app. This streamlines the process of collecting and analysing sensor data. In addition, the new design includes easy-to-interpret gauges that provide more thorough details and insights into the temperature and curing conditions of placed concrete.

The firm claims that the new development to the SmartRock mobile app and its ability to download all sensor data in one shot allows a user to further reduce the project schedule to deliver even faster access to concrete testing results.

SmartRock is a widely used wireless concrete sensor, currently being implemented in over 6,200 construction projects across 45 countries worldwide.

For more information on companies in this article

Related Content

  • Innovative GIS software offerings
    July 18, 2012
    The latest construction software developments can speed the construction process overall, Adrian Greeman reports Construction software is by its very nature a very fast moving technology, with new systems coming to the market almost continuously. There are some key developments however, such as major new product launches and market trends. One of the most important developments in the road design sector is the launch of the Bentley Systems V8i versions of its software, including its road design applications
  • New Volvo CE asphalt screeds available
    April 24, 2023
    Volvo CE is now offering new electric screed models aimed at use in large-scale paving operations. The electrically-heated, fixed screeds are designed to make large-scale paving more cost-effective and to boost productivity and efficiency for major road projects.
  • App upgrades and power choices
    December 10, 2024
    New power options and app options are available for the crushing and screening segment
  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.