Skip to main content

Effective drainage construction with Kijlstra

Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
October 27, 2016 Read time: 2 mins
Drainage products specialist drainage 7049 Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time.

The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units.

The precast concrete box culverts are designed to withstand heavy road loadings and are said to combine strength with durability, with the individual sealed joints eliminating the need for any grouting on site.

Designed to BS-Eurocode guidelines BS-EN 1990/1991/1992 using Load Models LM1 and LM2 for a design life of up to 100 years, the culverts are manufactured from poured monolithic self-compacting concrete giving a high-quality finish and optimum hydraulic characteristics. The C40/50 concrete is rated to the highest sulphate resistance exposure class XA3 for use in highly aggressive chemical environments.

Available in a large range of standard sizes up to 2m, bespoke options are also offered.

For more information on companies in this article

Related Content

  • New Metso ES screen’s enhanced screening efficiency
    June 24, 2013
    Metso ES is the Finnish firm’s new, robustly designed, high-energy, elliptical motion horizontal screen. The new screen is said to provide increased uptime and safer maintenance, while delivering up to 25% more screening capacity compared to a conventional screen of matching size. The two unbalanced shaft lines in the Metso ES rotate in opposite directions, generating a high-energy, elliptical motion with a self-synchronisation design. The new screen is said to be an innovative solution, performing brillian
  • ABM expands range of its pre-stressed concrete bridge beams
    July 7, 2016
    ABM reports that investment manufacturing equipment at its UK factory in Nottinghamshire is permitting production of an increased range of larger, heavier bridge components The new facility means that the company can now also manufacture U and W section prestressed concrete bridge beams of up to 120 tonnes. The company said that the additional capability means it can offer customers shorter cycle times, even for the heaviest and most complex beams, and a product of high and consistent quality. The dev
  • Drilling's novel solutions
    July 23, 2012
    In the drilling and hydraulic attachment sectors too, firms are offering novel solutions for the customer. Atlas Copco continues to develop its comprehensive range of drilling solutions in the shape of its latest down-the-hole (DTH) and SmartRig variants, as well as adding new compact rigs and new consumables to the line-up. The firm's latest Roc L630 DTH rig benefits from a new feed as well as improved cooling. The new aluminium feed is said to improve hole straightness and hole quality. It also allows the
  • Lochkov bridge construction time 'cut'
    July 17, 2012
    As part of the R1 southern orbital motorway around the Czech capital, Prague, a joint venture is building a five-span, 461m long and approximately 65m high viaduct near the village of Lochkov, as a girder bridge construction. For the two steeply inclined twin piers, Doka has supplied an automatic climbing formwork solution that obviates the need for shoring and that will "cut more than 100 days from the construction period." Cast-in-place concrete construction of bridge piers with such a steep inclination