Skip to main content

Effective drainage construction with Kijlstra

Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
October 27, 2016 Read time: 2 mins
Drainage products specialist drainage 7049 Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time.

The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units.

The precast concrete box culverts are designed to withstand heavy road loadings and are said to combine strength with durability, with the individual sealed joints eliminating the need for any grouting on site.

Designed to BS-Eurocode guidelines BS-EN 1990/1991/1992 using Load Models LM1 and LM2 for a design life of up to 100 years, the culverts are manufactured from poured monolithic self-compacting concrete giving a high-quality finish and optimum hydraulic characteristics. The C40/50 concrete is rated to the highest sulphate resistance exposure class XA3 for use in highly aggressive chemical environments.

Available in a large range of standard sizes up to 2m, bespoke options are also offered.

For more information on companies in this article

Related Content

  • Loading and hauling machine improvements will boost quarry production
    July 4, 2014
    Major advances are being seen in the market for loading and hauling machines, with manufacturers developing new solutions for the quarry segment in particular- Mike Woof writes Wheeled loaders and rigid chassis dump trucks are key movers in many quarry operations. New develop-ments have seen the introduction of several new models from key players.
  • Road repairs fuel demand for milling machines
    February 13, 2012
    A need for road repairs is fuelling demand for new milling machines, Mike Woof reports. With many roads in Europe and North America needing repairs, manufacturers continue to meet demand by offering improved compact milling machines, as well as full-sized planers. The versatile and manoeuvrable compact machines can play a useful role in on-site recycling jobs for urban road improvements while the larger mills can be vital for in-situ recycling work.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Better drainage planning with QuAD software
    April 19, 2021
    The QuAD software resilience tool from ACO Water Management allows users to test the efficiency of a proposed maintenance regime for a roadway water channel design.