Skip to main content

Effective drainage construction with Kijlstra

Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
October 27, 2016 Read time: 2 mins
Drainage products specialist drainage 7049 Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time.

The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units.

The precast concrete box culverts are designed to withstand heavy road loadings and are said to combine strength with durability, with the individual sealed joints eliminating the need for any grouting on site.

Designed to BS-Eurocode guidelines BS-EN 1990/1991/1992 using Load Models LM1 and LM2 for a design life of up to 100 years, the culverts are manufactured from poured monolithic self-compacting concrete giving a high-quality finish and optimum hydraulic characteristics. The C40/50 concrete is rated to the highest sulphate resistance exposure class XA3 for use in highly aggressive chemical environments.

Available in a large range of standard sizes up to 2m, bespoke options are also offered.

For more information on companies in this article

Related Content

  • Dual speed control for the V-Maxx G2 hopper spreader from SnowEx
    November 7, 2017
    SnowEx’s latest hopper spreader, the V-Maxx G2, for ice control applications includes a dual variable-speed control more compact than on previous models. The manufacturers says that the digital, self-diagnosing control unit allows independent adjustment of spinner and auger speeds, while convenient buttons offer easy control of the standard vibrator and optional accessories. It includes an auto reverse function to easily clear auger jams. The control requires only a single four-pin wire to enter the cab,
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Mallorca Airport upgrade completed
    September 21, 2021
    Palma de Mallorca Airport (PMI) reopened its northern runway (06L-24R) at the end of 2020, after completing the surface refurbishment work
  • Kijlstra mega-order for A1 upgrade
    February 9, 2017
    Kijlstra is supplying the A1 Leeming to Barton Improvement Scheme in the UK with one of the largest orders it has ever received for its precast square manholes. The Highways England scheme is being delivered by the Carillion Morgan Sindall joint venture. Once completed the scheme will unlock growth and boost the economy by creating a continuous motorway-standard route between London and Newcastle (including the M1 and A1M). It will also improve journey times and increase safety. As part of this proje