Skip to main content

E-Z Drill highlights 210B-2 on-grade drills at ConExpo 2014

E-Z Drill’s 210B-2 on-grade drills are being showcased at ConExpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchw
January 29, 2014 Read time: 3 mins
E-Z Drill’s 210B-2 on-grade drills are said to be easy-to-use units that can drill to a standard near 46cm depth
2976 E-Z Drill’s 210B-2 on-grade drills are being showcased at Conexpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchwork jobs.

The 210B-2 drills within 15.24cm of a corner and is said by E-Z Drill to provide an inexpensive option for a two-gang system. An optional vertical conversion kit enhances the series’ versatility, allowing each unit to switch from a horizontal drill to a vertical drill within 20 minutes.

As with the complete line of E-Z Drill products, the on-grade drills are said to offer numerous features to increase production and help prevent downtime. Quick-release bit guides correspond with any style of bit for a fast, simple exchange, while vertical height adjustment levels are said by E-Z Drill to enable each unit to drill on centre, whether the slab is 15.24cm or 60.96cm thick. E-Z Drill’s patented roller bearing feed system is said to eliminate friction while drilling, increasing speed and productivity. Drill carriages can easily be replaced, as needed, with basic tools, and quick coupler air fittings further simplify maintenance. Regulators on the 210B-2 allow the operator to set the optimum drilling speed for each individual drill.

Both the 210B-2 and 210B on-grade models feature components to protect the machine, as well as the operator. Carriage locks secure the drill and bit in place when the air supply is off or disconnected, and auto-lock couplers automatically secure the air supply hose onto the drill coupling so that the connection does not need to be manually pinned. Individual oilers help the drill motor last longer by lubricating each drill from separate reservoirs.

On-grade models operate on the subgrade, allowing work to continue without obstructing the traffic lane. Another advantage offered by on-grade units is that they are lighter to load and unload than slab-rider models. In addition to the 210B-2 and 210B, the E-Z Drill on-grade line includes the smaller 65B, 85B and 110B models.









%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 52222 0 oLinkExternal www.EZdrill.com E-Z Drill web false /EasySiteWeb/GatewayLink.aspx?alId=52222 false false%>

For more information on companies in this article

Related Content

  • Terex Finlay adds to mobile primary crusher offering
    April 18, 2013
    Terex Finlay has developed the J-1170 primary mobile jaw crusher. Built around the proven 1,100mmx700mm jaw crusher, the machine is intended for primary reduction and product sizing of blasted rock and ore material. The J-1170 is powered by a choice of Tier 3/Stage IIIA Caterpillar C9 engine delivering 261kW, or a Tier 4 Interim/Stage IIIB Scania DC9 that puts out 257kW. The jaw chamber is hydrostatically driven, offering operators a reversible action in the event of a blockage. The system also provides var
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    August 12, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region.
  • Cap Minerals shows EmiControls V12 dust controller
    January 6, 2017
    Distributor Cap Minerals is showing the latest model of the V12 dust controller, whose manufacturer is EmiControls by TechnoAlpin. Applications include working with primary crushers and stockpiles as well as in construction and demolition. The machine can be put on wheels or even mounted on a tower. The V12 sends out a fine water spray to keep the dust down and it can control dust across a distance of up to 50m, said Cap Minerals. The high-performance fan oscillates vertically and horizontally for optimum c