Skip to main content

E-MAK introduces sand dryer innovation

Turkish firm E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry. As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.
April 15, 2016 Read time: 2 mins
E-MAK’s new Sandry system can help reduce plant fuel bills

Turkish firm 208 E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry.

As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.

The Sandry is designed to handle the 0-5mm sand fractions as these have the greatest surface area, retaining the highest moisture content and requiring separate treatment from larger grain sizes. With conventional systems, all the fractions pass through the same route from the storage hoppers to the drum, however the new Sandry ensures that the 0-5mm grain sizes take a longer route through the system, allowing the moisture to be minimised.

The 0-55mm feed material is routed into a hopper at the top of the Sandry, then is tipped in metred quantities onto the internal shelves. These tip in turn at timed intervals onto the series of shelves down the height of the Sandry’s tower. This process ensures the material is dried as the tower is kept at a constant temperature of 100°C by the two burners. And as the sand does not contain bitumen at this stage, the burners are able to operate with direct heating. The dried 0-5mm fractions then collect at the bottom of the Sandry, where they can be mixed with the 5-38mm fractions at the entrance to the mixer drum.

Because the 0-5mm fractions are preheated and have the moisture removed, this reduces the heating required in the mixer drum substantially, as well as helping to optimise material flow and allow the plant to achieve its capacity. It can be introduced into the material delivery system of most asphalt plants according to the firm.

The system has been extensively tested in the Turkish quarry belonging to the Simge Group, E-MAK’s parent company. As a result the unit is now said to be ready for the market and the firm says that this piece of equipment can help customers make substantial cuts to fuel bills.

For more information on companies in this article

Related Content

  • Wirtgen’s new recycling technology
    June 22, 2018
    Wirtgen is offering an array of new technologies for milling, recycling and stabilising applications. These are intended to boost accuracy, versatility and performance. A new milling drum assembly is offered that widens the range of applications that the Wirtgen W 150 CF/W 150 Cfi milling machines can handle. This redesigned assembly allows users to select an array of cutter drums, including a 1.8m-wide unit. According to the firm, the machines offer the highest power to weight ratio for their class, with d
  • Compaction control boosts efficiency
    March 14, 2012
    Effective compaction control is one of a series of technical innovations boosting performance efficiency – Mike Woof writes. Maximising compaction efficiency can be a major cost factor on construction projects. Both for soil and asphalt compaction sectors, the risk from leaving an area under or over-compacted is substantial.
  • Asphalt paving innovations are coming
    July 28, 2023
    Innovative new machines are coming to market that will boost efficiency for the asphalt paving segment
  • Advances in road milling technology
    June 4, 2019
    New systems developed for the road milling machine market will boost safety and efficiency