Skip to main content

E-MAK introduces sand dryer innovation

Turkish firm E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry. As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.
April 15, 2016 Read time: 2 mins
E-MAK’s new Sandry system can help reduce plant fuel bills

Turkish firm 208 E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry.

As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.

The Sandry is designed to handle the 0-5mm sand fractions as these have the greatest surface area, retaining the highest moisture content and requiring separate treatment from larger grain sizes. With conventional systems, all the fractions pass through the same route from the storage hoppers to the drum, however the new Sandry ensures that the 0-5mm grain sizes take a longer route through the system, allowing the moisture to be minimised.

The 0-55mm feed material is routed into a hopper at the top of the Sandry, then is tipped in metred quantities onto the internal shelves. These tip in turn at timed intervals onto the series of shelves down the height of the Sandry’s tower. This process ensures the material is dried as the tower is kept at a constant temperature of 100°C by the two burners. And as the sand does not contain bitumen at this stage, the burners are able to operate with direct heating. The dried 0-5mm fractions then collect at the bottom of the Sandry, where they can be mixed with the 5-38mm fractions at the entrance to the mixer drum.

Because the 0-5mm fractions are preheated and have the moisture removed, this reduces the heating required in the mixer drum substantially, as well as helping to optimise material flow and allow the plant to achieve its capacity. It can be introduced into the material delivery system of most asphalt plants according to the firm.

The system has been extensively tested in the Turkish quarry belonging to the Simge Group, E-MAK’s parent company. As a result the unit is now said to be ready for the market and the firm says that this piece of equipment can help customers make substantial cuts to fuel bills.

For more information on companies in this article

Related Content

  • Asphalt plants: alternative fuels on the horizon
    November 22, 2022
    Many asphalt plant manufacturers such as Ammann, Benninghoven and Fayat have already developed contingencies for alternative fuels.
  • Increased use of reclaimed asphalt, reduced emissions
    February 10, 2012
    Reducing emissions and increasing the use of reclaimed asphalt pavement is among the key aims of plant manufacturers. Patrick Smith reports. Lower emissions and the use of recycled materials coupled with reduced costs are the aims of manufacturers of modern asphalt plants.
  • A new Marini asphalt plant for Strabag
    April 20, 2023
    Austria’s major contractor Strabag recently decided to purchase a new Marini Class Tower asphalt plant
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac