Skip to main content

E-MAK introduces sand dryer innovation

Turkish firm E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry. As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.
April 15, 2016 Read time: 2 mins
E-MAK’s new Sandry system can help reduce plant fuel bills

Turkish firm 208 E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry.

As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.

The Sandry is designed to handle the 0-5mm sand fractions as these have the greatest surface area, retaining the highest moisture content and requiring separate treatment from larger grain sizes. With conventional systems, all the fractions pass through the same route from the storage hoppers to the drum, however the new Sandry ensures that the 0-5mm grain sizes take a longer route through the system, allowing the moisture to be minimised.

The 0-55mm feed material is routed into a hopper at the top of the Sandry, then is tipped in metred quantities onto the internal shelves. These tip in turn at timed intervals onto the series of shelves down the height of the Sandry’s tower. This process ensures the material is dried as the tower is kept at a constant temperature of 100°C by the two burners. And as the sand does not contain bitumen at this stage, the burners are able to operate with direct heating. The dried 0-5mm fractions then collect at the bottom of the Sandry, where they can be mixed with the 5-38mm fractions at the entrance to the mixer drum.

Because the 0-5mm fractions are preheated and have the moisture removed, this reduces the heating required in the mixer drum substantially, as well as helping to optimise material flow and allow the plant to achieve its capacity. It can be introduced into the material delivery system of most asphalt plants according to the firm.

The system has been extensively tested in the Turkish quarry belonging to the Simge Group, E-MAK’s parent company. As a result the unit is now said to be ready for the market and the firm says that this piece of equipment can help customers make substantial cuts to fuel bills.

For more information on companies in this article

Related Content

  • Innovative asphalt paver advances for 2015
    April 8, 2015
    Pressure on asphalt paver manufacturers to develop new and more efficient machines is bringing results - Mike Woof writes. For all the key manufacturers in the asphalt paving segment, pressure is being brought to bear with regard to the development of new and more efficient machines. Both for US and European style of pavers, incremental improvements are being seen in machines. In keeping with regulations for Europe and North America, many of the new generation machines are now being powered by the latest lo
  • US asphalt and quarry show highlights new technology
    May 8, 2015
    New technology was one key focus area for the World of Asphalt/AGG1 event run recently in the US city of Baltimore - Mike Woof writes Technology has been a major focus for the combined World of Asphalt and AGG1 2015 exhibition and conference held in Baltimore. The exhibition area attracted 450 exhibitors and covered a larger area than for previous events, while over 10,000 education season tickets were bought by those wanting to attend the presentation sessions. The event was held from March 17th- March
  • Asphalt plant development is heading in different directions?
    June 14, 2017
    Developments in asphalt plant technology are seeing major gains in energy efficiency and the use of RAP but some manufacturers are moving in different directions - Mike Woof writes. Asphalt Drum Mixers is offering its EX120 asphalt plant as a solution for producers needing a portable counterflow plant that can process high percentages of RAP. The plant features single-drum counterflow technology and is said to be compact, with a capacity of 120tonnes/hour, while the firm says that the machine meets all fede
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a