E-MAK introduces sand dryer innovation

Turkish firm E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry. As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.
April 15, 2016 Read time: 2 mins
E-MAK’s new Sandry system can help reduce plant fuel bills

Turkish firm 208 E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry.

As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.

The Sandry is designed to handle the 0-5mm sand fractions as these have the greatest surface area, retaining the highest moisture content and requiring separate treatment from larger grain sizes. With conventional systems, all the fractions pass through the same route from the storage hoppers to the drum, however the new Sandry ensures that the 0-5mm grain sizes take a longer route through the system, allowing the moisture to be minimised.

The 0-55mm feed material is routed into a hopper at the top of the Sandry, then is tipped in metred quantities onto the internal shelves. These tip in turn at timed intervals onto the series of shelves down the height of the Sandry’s tower. This process ensures the material is dried as the tower is kept at a constant temperature of 100°C by the two burners. And as the sand does not contain bitumen at this stage, the burners are able to operate with direct heating. The dried 0-5mm fractions then collect at the bottom of the Sandry, where they can be mixed with the 5-38mm fractions at the entrance to the mixer drum.

Because the 0-5mm fractions are preheated and have the moisture removed, this reduces the heating required in the mixer drum substantially, as well as helping to optimise material flow and allow the plant to achieve its capacity. It can be introduced into the material delivery system of most asphalt plants according to the firm.

The system has been extensively tested in the Turkish quarry belonging to the Simge Group, E-MAK’s parent company. As a result the unit is now said to be ready for the market and the firm says that this piece of equipment can help customers make substantial cuts to fuel bills.

For more information on companies in this article

Related Content

  • MT 3000-2i from Vögele - now with Offset PowerFeeder version
    April 15, 2016
    Designed to optimise throughput, the MT 3000-2i from Vögele is now available with an Offset PowerFeeder version. This highly productive material transfer vehicle helps ensure homogeneity and quality in high output paving operations such as for highways. Its large hopper and innovative conveying system are key features that allow a 35tonne storage capacity and high throughput. Its maximum conveying capacity is 1,200tonnes/hour, allowing the machine to handle the full load from a 25tonne capacity asphalt deli
  • Kieswerk Kohler solves fines problem with M2500 from CDE
    September 26, 2013
    Following installation of the M2500 mobile washing plant, Kieswerk Kohler is said to have addressed the issues caused by excess fines in the material at their quarry in Engen / Welschingen, southern Germany. The solution offered by CDE has also enabled the production of an additional sand product which the company is now able to offer customers. The raw material processed by Kieswerk Kohler at the site contains a large proportion of material smaller than 250 microns. With the crushing and screening proce
  • Concrete production advances
    July 23, 2020
    New developments in concrete production will help customers deliver a quality product in timely fashion
  • The right way to retrofit for RAP
    November 14, 2013
    Retrofitting an existing asphalt plant is only the first step in the successful production of mixes containing RAP –fine tuning and know-how are also required. The Fayat Group, owner of Marini, shares some of its secrets with Kristina Smith Many asphalt producers are making mistakes when producing mixes containing RAP, says Mikael Azran, head of marketing for Fayat mixing plants. The result is that they are wasting energy and could be in danger of producing lower quality mixes.