Skip to main content

DynaGate swings into action

DynaGate offers a new solution to boost road safety.
By David Arminas October 30, 2024 Read time: 2 mins
Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source (image courtesy DynaRoads)


Road maintenance in or around the entrance to tunnels and on bridges has specific risks due to the close proximity of workers to live traffic. Even if vehicle speeds are low around worksites, effective lane management is essential for greatly reducing the risk of injury to maintenance staff.

This is also why the moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads. It literally swings into action to enable traffic to cross over the centre strip, for example in or near tunnels or bridges.

The system comes with a choice of one or two movable barriers. Its modular construction allows the length to be determined by project specifications and also allows for easy maintenance, expansion and replacement of component parts.

The system can be operated in situ from a roadside control cabinet or by onsite workers from a control panel on the system itself. For added convenience, it can be operated also remotely from a traffic control centre.

It has a manual or automatic operating mode. Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source. Time for complete lane alteration is around three minutes.

The solution consists of two central reservation crossings with “wing” barrier sections that open to a length of 94m. The width is 60cm and the height is 84cm while the length can be up to 200m, depending on the client requirements. Only a normal uninterruptible power source, 3x240V is needed for swing operation which can be controlled via the internet.

For added safety, there are mounted onto the gates dimmable LED running lights located at 3m intervals and there is a dimmable LED arrow sign on twistable safety-end of the swinging gate section. Reflector strips, red and white, can run the length of the gate.

 

Related Content

  • Peri cantilever for Terfener Bridge
    May 17, 2021
    The Terfener Innbrücke reconstruction in the Inntal valley started in 2018 and is currently one of largest bridge construction projects in western Austria. In addition to providing planning services and onsite support, Peri has used its VBC Balanced Cantilever Carriage for the first time in Central Europe.
  • Expanding the Panamericana Oestae Highway in Panama
    November 3, 2023
    Expansion of the Panamericana Oeste highway is an infrastructure project that will help guarantee the future of Panama - Mauro Nogarin writes
  • Pilosio and CMC Ravenna collaborate on Cornubia Interchange
    June 4, 2019
    The South African branch of the Italian construction company CMC di Ravenna again teamed up with formwork specialist Pilosio to take advantage of Pilosio's solutions. This time it was for construction of a new bridge in the city of Durban, a project named N2/Cornubia Interchange. The overpass will streamline traffic by linking the Umhlanga industrial zone with the Cornubia new development area Tongat. Cornubia is a multibillion rand integrated settlement near Umhlanga, north of Durban, in KwaZulu Natal,
  • VIDEO: Switzerland’s Astra Bridge concept to be tendered
    May 23, 2019
    Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is