Skip to main content

DustBoss DB-100 from DCT delivers massive coverage area

Dust Control Technology, among the leaders in open area dust suppression, has announced its newest and largest-ever design with the introduction of the DustBoss DB-100. Engineered specifically to deliver the power to reach the working face of large quarries and open cast mines, the new dust suppressor has a range of more than 100m, giving it ample reach to cover material stockpiles 61m-91.5m high. The giant atomised misting unit from DCT stands nearly 2.4m tall, and can cover an area of more than 26,000m²
January 6, 2017 Read time: 2 mins
Dust Control Technology’s largest-ever dust suppresordesign, the DustBoss DB-100
2594 Dust Control Technology, among the leaders in open area dust suppression, has announced its newest and largest-ever design with the introduction of the DustBoss DB-100.

Engineered specifically to deliver the power to reach the working face of large quarries and open cast mines, the new dust suppressor has a range of more than 100m, giving it ample reach to cover material stockpiles 61m-91.5m high.

The giant atomised misting unit from DCT stands nearly 2.4m tall, and can cover an area of more than 26,000m² from a single location.

The DB-100 was designed with input from some of the world’s leading mining and quarrying companies, with data collected from numerous site visits, where visibility around huge working areas can be profoundly impacted by dust.

“Most operations use water trucks to wet down haul roads before trucks enter the area for loading,” says DCT CEO Edwin Peterson.  “Unfortunately, the technique is only marginally beneficial on surface dust, and it has virtually no effect on airborne particles.

“This new unit will reach all the way to the working face of a quarry or mine, knocking down dust from the shovel right as it picks up or drops material. With the improved visibility and air quality, quarrying and mining companies can maintain a safer and more productive workplace.”









%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 56655 0 oLinkExternal www.DustBoss.com Dust Control Technology web false /EasySiteWeb/GatewayLink.aspx?alId=56655 false false%>

For more information on companies in this article

Related Content

  • Ramtec presents hydraulic hammer
    March 16, 2012
    Ramtec’s backhoe series hydraulic hammer BH30C is designed to fit all modern backhoe loaders, larger mini excavators and skid steer loaders. The company will demonstrate sound suppressing housing, for 3-6,500kg carriers, at INTERMAT 2012.Launched last spring, the BH30C has been selling well to western European markets. At the Pre-Intermat event, Ramtec stressed their keenness to link up with UK distributors for its extensive product range
  • GCS Flex system is important introduction for Trimble
    January 6, 2017
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • GCS Flex system is important introduction for Trimble
    April 17, 2013
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • Demolition starts on Seattle’s Alaska Way Viaduct
    June 14, 2019
    Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.