Skip to main content

DustBoss DB-100 from DCT delivers massive coverage area

Dust Control Technology, among the leaders in open area dust suppression, has announced its newest and largest-ever design with the introduction of the DustBoss DB-100. Engineered specifically to deliver the power to reach the working face of large quarries and open cast mines, the new dust suppressor has a range of more than 100m, giving it ample reach to cover material stockpiles 61m-91.5m high. The giant atomised misting unit from DCT stands nearly 2.4m tall, and can cover an area of more than 26,000m²
January 6, 2017 Read time: 2 mins
Dust Control Technology’s largest-ever dust suppresordesign, the DustBoss DB-100
2594 Dust Control Technology, among the leaders in open area dust suppression, has announced its newest and largest-ever design with the introduction of the DustBoss DB-100.

Engineered specifically to deliver the power to reach the working face of large quarries and open cast mines, the new dust suppressor has a range of more than 100m, giving it ample reach to cover material stockpiles 61m-91.5m high.

The giant atomised misting unit from DCT stands nearly 2.4m tall, and can cover an area of more than 26,000m² from a single location.

The DB-100 was designed with input from some of the world’s leading mining and quarrying companies, with data collected from numerous site visits, where visibility around huge working areas can be profoundly impacted by dust.

“Most operations use water trucks to wet down haul roads before trucks enter the area for loading,” says DCT CEO Edwin Peterson.  “Unfortunately, the technique is only marginally beneficial on surface dust, and it has virtually no effect on airborne particles.

“This new unit will reach all the way to the working face of a quarry or mine, knocking down dust from the shovel right as it picks up or drops material. With the improved visibility and air quality, quarrying and mining companies can maintain a safer and more productive workplace.”









%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 56655 0 oLinkExternal www.DustBoss.com Dust Control Technology web false /EasySiteWeb/GatewayLink.aspx?alId=56655 false false%>

For more information on companies in this article

Related Content

  • Controls has international test appeal
    January 6, 2017
    Founded in Milan in 1968 with the aim of manufacturing and distributing testing instruments, machines and systems for the construction and civil engineering industries, Controls is now a leading and globally-renowned producer of testing equipment. With branches in France, Mexico, Poland, Spain and the UK, and with more than 100 qualified distributors across the world, Controls says it can satisfy customers with its operating efficiency, technical know-how and after sales care.
  • Controls has international test appeal
    March 27, 2013
    Founded in Milan in 1968 with the aim of manufacturing and distributing testing instruments, machines and systems for the construction and civil engineering industries, Controls is now a leading and globally-renowned producer of testing equipment. With branches in France, Mexico, Poland, Spain and the UK, and with more than 100 qualified distributors across the world, Controls says it can satisfy customers with its operating efficiency, technical know-how and after sales care.
  • World’s largest hammer makes breakthrough at bauma
    January 6, 2017
    HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at bauma. The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist. The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing. HammerHead CEO and president
  • World’s largest hammer makes breakthrough at bauma
    April 18, 2013
    HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at bauma. The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist. The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing. HammerHead CEO and president