Skip to main content

Dust control from Superior

Superior Industries has developed a new Modular Skirting System. The system is said to be easy to install and controls dust and prevents spillage within conveyor load and transfer zones.
May 9, 2023 Read time: 1 min
Effective dust control is claimed for the new skirting system from Superior

The new Skirting System retrofits to any brand of existing structure with little or no field fabrication. Two sets of adjustable legs aid in this universal installation. Additionally, easy to adjust clamping mechanisms are used in place of nuts and bolts to hold skirtboard rubber against the belt. An optional stilling zone is available to accelerate the settling of dust while material is moving inside the system. Superior’s Modular Skirting System is sold in 1.5m sections for conveyor belt widths up to 1.73m.

For more information on companies in this article

Related Content

  • BOMAG’s new asphalt paver range
    November 26, 2021
    Road construction machinery specialist BOMAG is introducing a new asphalt paver range. In addition, the company is also launching its BOMAG Advanced Pave system, which is said to be a digital co-pilot package
  • Atlas Copco’s Hydro Magnet
    May 14, 2014
    The latest complement to Atlas Copco’s range of hydraulic attachments is the Hydro Magnet, a range of profitable tools for recycling plants, scrapyards and the demolition industry. Hydro Magnets enable valuable iron and steel to be separated quickly and easily from concrete waste for subsequent recycling. Simply installed on the existing grapple or shear installation, they require no extra generator or electro cable on the carrier. Two Hydro Magnets are available in two versions, as a fixed magnet (F),
  • Growing niche market for roller compacted concrete
    February 20, 2012
    A growing niche market for roller compacted concrete has prompted manufacturers to offer solutions. Mike Woof reports. Increased demand for roller compacted concrete (RCC) machines in certain applications mean that this is now a growing market, with manufacturers having developed new machines for this sector. RCC comprises uncrushed and/or crushed aggregate, hydraulic binders and may also contain concrete additives. It is mixed in a concrete mixing plant on or near the job site and one of its main benefits
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v