Skip to main content

Durable chevrons to boost site vehicle conspicuity and safety

Contractor Colas has worked with Farnborough Signs to develop safer temporary chevrons for use on vehicles accessing construction sites. Colas identified a potential safety risk with removable magnetic Chapter 8 Chevrons used for vehicles visiting worksites. Operational site vehicles have to be fitted with permanent Chapter 8 Chevron markings. However, the change in car manufacturing specifications in recent years has resulted in many car boots being made of plastic instead. Earlier generation magnetic
January 31, 2017 Read time: 2 mins
They firm says that the chevrons are quick and easy to fit and improve the visibility of vehicles and ensure requirements are met
Contractor 184 Colas has worked with Farnborough Signs to develop safer temporary chevrons for use on vehicles accessing construction sites. Colas identified a potential safety risk with removable magnetic Chapter 8 Chevrons used for vehicles visiting worksites.

Operational site vehicles have to be fitted with permanent Chapter 8 Chevron markings. However, the change in car manufacturing specifications in recent years has resulted in many car boots being made of plastic instead. Earlier generation magnetic Chapter 8 chevrons will not adhere to plastic boots as a result. The new Chapter 8 Chevrons can be cut to size and easily attached with both suckers and straps, alleviating the risk of them coming loose or falling off.

The firm says that these are easy to fit and also highly visible. The new chevrons have been trialled on the M3 Project where Colas has been working for 1146 Balfour Beatty on a Smart Motorway for 8100 Highways England covering 25km of carriageway from junctions 4a to 2.

David Neal, Balfour Beatty Project Director, said: “The industry needed a workable solution for those visiting worksites in hire cars or company cars. A number of operational staff working on the M3 project have trialled them and the feedback has been very positive."

For more information on companies in this article

Related Content

  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed
  • When the rain comes
    July 18, 2012
    Statistics show that wet weather and the dark is not the best mix for driving, but road markings offer a safety solution While good road markings are essential any time of the day, it is perhaps at night when roads are wet that they can offer extra guidance. Statistics are said to reveal that an estimated 50% of all accidents happen during the night when it rains but such conditions occur only 10% of the time and when there are usually less vehicles on the road. Indeed, at the 1st Road Marking Symposium hel
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong