Skip to main content

Durable chevrons to boost site vehicle conspicuity and safety

Contractor Colas has worked with Farnborough Signs to develop safer temporary chevrons for use on vehicles accessing construction sites. Colas identified a potential safety risk with removable magnetic Chapter 8 Chevrons used for vehicles visiting worksites. Operational site vehicles have to be fitted with permanent Chapter 8 Chevron markings. However, the change in car manufacturing specifications in recent years has resulted in many car boots being made of plastic instead. Earlier generation magnetic
January 31, 2017 Read time: 2 mins
They firm says that the chevrons are quick and easy to fit and improve the visibility of vehicles and ensure requirements are met
Contractor 184 Colas has worked with Farnborough Signs to develop safer temporary chevrons for use on vehicles accessing construction sites. Colas identified a potential safety risk with removable magnetic Chapter 8 Chevrons used for vehicles visiting worksites.

Operational site vehicles have to be fitted with permanent Chapter 8 Chevron markings. However, the change in car manufacturing specifications in recent years has resulted in many car boots being made of plastic instead. Earlier generation magnetic Chapter 8 chevrons will not adhere to plastic boots as a result. The new Chapter 8 Chevrons can be cut to size and easily attached with both suckers and straps, alleviating the risk of them coming loose or falling off.

The firm says that these are easy to fit and also highly visible. The new chevrons have been trialled on the M3 Project where Colas has been working for 1146 Balfour Beatty on a Smart Motorway for 8100 Highways England covering 25km of carriageway from junctions 4a to 2.

David Neal, Balfour Beatty Project Director, said: “The industry needed a workable solution for those visiting worksites in hire cars or company cars. A number of operational staff working on the M3 project have trialled them and the feedback has been very positive."

For more information on companies in this article

Related Content

  • UK motorway upgrade ahead of schedule
    May 1, 2014
    Joint venture contractor Skanska Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network.
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Digital opportunities: Eurasphalt & Eurobitume (E&E) event, Berlin
    July 3, 2018
    Traditional players in the European bitumen sector need to grasp digital technology in all its forms to survive. Kristina Smith reports from the recent E&E conference in Berlin.
  • Intelligent road studs aim to make roads safer
    May 3, 2012
    High-tech road markings are being used in a bid make roads safer in Europe as Patrick Smith reports Intelligent road studs are being installed on two of the busiest sections of the main roads heading towards the port of Dover in County Kent, south-east England.