Skip to main content

Doosan new high performing crawler excavators on show

A number of Doosan’s wide range of new Stage IV/Tier 4 Final crawler excavators are new from the firm.
January 6, 2017 Read time: 2 mins

A number of 695 Doosan’s wide range of new Stage IV/Tier 4 Final crawler excavators are new from the firm.

Launched in December 2014, a total of six models ranging from 24-40tonnes are part of the overall new crawler excavator line-up.

The 25tonne DX255LC-5 can be used for diverse applications including clearing land for initial site development, excavating for foundations and trenching for utilities, and for earthmoving and maintenance work for highway, civil engineering and general construction projects. Whilst overall dimensions are similar to the previous DX255LC-5 model, the Stage IV version is said to combine greater power with a 500kg increase in operating weight, resulting in claimed increases of up to 17% in lifting capacities over both the front and side and a 1 dBA reduction in sound levels.

A Doosan DLO6P six-cylinder, turbocharged engine on the DX255LC-5 is said to offer 5% more engine power than its previous generation LC-3 model, with the new Stage IV crawler excavator also offering an average fuel consumption reduction of 4% to 9% on the DX255LC-3.

Like all Doosan’s other Stage IV/Tier 4 Final crawler excavators, the DX255LC-5 is fitted with the new state-of-the-art CoreTMS wireless fleet monitoring system as standard. Designed specifically for the Doosan range, the system provides thorough information about machine performance in a dual mode (satellite, GSM). As the software in the Core TMS has been upgraded to communicate directly with the EPOS system on a Doosan excavator, it is said to be the only tool of its type capable of providing customers with this level of insightful, cost-saving data.

The six new Doosan models in the 24-40tonne operating weight range are the DX235LCR-5, DX235NLC-5, DX255LC-5, DX300LC-5, DXC340LC-5, and the DX380LC-5.

For more information on companies in this article

Related Content

  • Hitachi revamps excavators to boost performance
    January 15, 2016
    Hitachi Construction Machinery (Europe) says that its new ZX350LC-6 excavator offers durability and efficiency The machine comes with added protection for key components and is said to offer reliability and high availability. Enlarged track guards reduce potential damage to track links. The front attachment’s durability has been enhanced by HN bushings to strengthen the brackets on the boom end and foot, and reinforced resin thrust plates on the boom. The 210kW Zaxis-6 medium excavator incorporates hi
  • New HL757-9A Hitachi wheeled loader
    September 25, 2013
    Hyundai Heavy Industries has unveiled its new 15tonne class HL757-9A wheeled loader. Boasting a standard shovel volume of 2.7m³ and 15tonne operating weight and offered in three versions, the standard HL757-9A model has a 2.84m dumping height and a maximum reach of 1.61m. The HL757XTD-9A High Reach model version has a 3.23m dumping height and a reach of up to 1.97m. And the HL757TM-9A (ToolMaster) model with parallel mast comes with a tipping height of up to 2.84m and a top reach of 1.81m. This mast may
  • Digging It gets down with Hyundai fleet
    October 3, 2018
    Ben Boare is the founder and managing director of Digging It Groundworks – a multifaceted construction company based in Andover in southern England. Boare formed Digging in 2007. “We initially started out doing small groundworks jobs, but as the years pass by we are focusing more and more on the plant hire side of things and our crushing, screening and recycling operation,” he said. The company has historically run a mixed fleet of hydraulic excavators, including JCB, Volvo, Takeuchi and Kubota. But in re
  • Software tools aid construction, reduce costs
    February 28, 2012
    Integrated construction software offers an effective planning solution - *Mark Nichols writes. In a world where resources are limited, 20 year designing and building in a sustainable way is more critical than ever. By employing today's software tools it is possible to reduce the total cost of construction of a new highway, while reducing operating costs and environmental impacts. The path to achieving the greatest gains is to take a holistic approach to the plan, design, construct and operate process from t