Skip to main content

Doosan ADTs provide haulage for Kenyan dam project

In Kenya, a fleet of eight Doosan MT41 articulated dump trucks (ADTs) is being used to carry materials to a major dam project The Chemususu Dam in the Rift Valley, 250km north-east of the capital Nairobi is one of several dams being constructed with heavy investment from the Government of Kenya.The aim is to make access to safe water much easier, removing the need for the long journeys to remote water sources made every day by women and children from small villages across the country to fetch water for thei
April 3, 2013 Read time: 3 mins
Doosan ADTs constantly move up and down the steep mountain roads

In Kenya, a fleet of eight Doosan MT41 articulated dump trucks (ADTs) is being used to carry materials to a major dam project

The Chemususu Dam in the Rift Valley, 250km north-east of the capital Nairobi is one of several dams being constructed with heavy investment from the Government of Kenya.

The aim is to make access to safe water much easier, removing the need for the long journeys to remote water sources made every day by women and children from small villages across the country to fetch water for their families.

Works for the dam started in 2009 and will cover a total of 95 hectares with the dam providing a capacity of 11 billion m³ of water when completed.

The 695 Doosan MT41 ADTs, being used by a company called Frabo & Co, carry rock down the steep slopes of a nearby quarry and on to the site of the dam. Several million tonnes of rock must be extracted from the hillsides and transported to help form the gigantic dam wall which will have a height of 60m.

“During the rainy season, the dusty roads turn into slippery and very muddy surfaces. With their tandem bogie system, the Doosan trucks have no difficulty climbing up the slopes. They always have traction.
As a result, we do not have to stop working when the rain falls,” says Booker Mbugua, managing director of Frabo & Co. According to Mr Mbugua, some of the roads on the project have near-to 360° curves.

With the turning ring mounted at the front of the trucks, the Doosan ADTs are said to ensure excellent stability, preventing tyre wear and avoiding the use of a differential lock system.

To reach the dump site on top of the high stone wall at the dam, the operators have to drive backwards into a very narrow piece of road between the cliffs.

According to the operators, the visibility offered by the Doosan machines ensures that they can tip the load with no fear as they can see all around when driving in reverse.

The Chemususu Dam is due to be finished later this year, and it is estimated that it will produce a daily total of 35 million m³ of water, which is treated in a specialised plant before being distributed to the various neighbouring communities.

For more information on companies in this article

Related Content

  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Wirtgen group machines flying high at İstanbul Yeni Havalimanı
    May 21, 2018
    Plant and machines from Wirtgen, Vögele, Hamm and Benninghoven are playing a vital part in the construction of Istanbul’s new airport . Istanbul’s new airport is Turkey’s biggest infrastructure project ever. It is also expected to become the world's largest airport by estimated passenger numbers.
  • The Terex TR60 makes the grade at Longcliffe quarry in Matlock
    May 1, 2018
    Calcium carbonate and limestone processor Longcliffe is using a number of Terex haulers to move premium limestone and recycled materials around its quarry in Derbyshire. Apart from the construction sector, Longcliffe’s Brassington Moor Quarry near Matlock supplies a variety of industries, from animal feed manufacturers to glass, plastic and adhesive businesses.