Skip to main content

Doka’s stripped-back d3 tower for emerging markets

In 2015, formwork specialist Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets. At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility. “W
April 19, 2016 Read time: 2 mins
In 2015, formwork specialist 203 Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets.

At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility.

“We have reduced it to the minimum functionality to produce a very economical version of this product for emerging markets,” said Doka’s director of research and development Johann Peneder.

Doka is initially marketing d3 to projects in Southeast Asia and the Middle East with plans to roll it out to other regions in the future.

All videos

For more information on companies in this article

Related Content

  • RMD divisional operations director Ian Hayes on global formwork market
    May 21, 2014
    Ian Hayes, RMD Kwikform’s divisional operations director, gives an overview of the current global formwork and shoring market Over the recent past, the formwork and shoring market has been changing as the global economic recovery begins to take shape and different countries again begin to invest in key infrastructure projects. Notably there has been a shift in the Middle East, as countries like Saudi Arabia, Kuwait and Oman embark on major airport and the road infrastructure projects to support developme
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Liebherr is optimistic for its financial performance
    November 25, 2014
    At bauma China 2014, Liebherr announced new machines while also revealing its latest results. The company is optimistic for its financial performance, despite tough market conditions at present.
  • Liebherr is optimistic for its financial performance
    January 6, 2017
    At bauma China 2014, Liebherr announced new machines while also revealing its latest results. The company is optimistic for its financial performance, despite tough market conditions at present.