Skip to main content

Doka’s stripped-back d3 tower for emerging markets

In 2015, formwork specialist Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets. At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility. “W
April 19, 2016 Read time: 2 mins
In 2015, formwork specialist 203 Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets.

At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility.

“We have reduced it to the minimum functionality to produce a very economical version of this product for emerging markets,” said Doka’s director of research and development Johann Peneder.

Doka is initially marketing d3 to projects in Southeast Asia and the Middle East with plans to roll it out to other regions in the future.

All videos

For more information on companies in this article

Related Content

  • LiuGong has upgraded soil compactors
    January 6, 2017
    LiuGong is now offering its upgraded 12tonne class 6612B soil compactor. This B-series machine benefits from an upgraded driveline and compaction system, boosting performance. Power comes from a Tier 3/Stage IIIA diesel delivering 104kW and the machine is aimed at customers in developing markets such as the Middle East and Africa. Performance is said to be improved over the previous generation while the machine also has an upgraded cab with better controls and all round visibility.
  • E&E Event in Vienna: Transforming bitumen
    November 25, 2022
    The recent E&E Event in Vienna suggests that decarbonisation, digitalisation and diversification are fast changing the road paving sector, reports Kristina Smith.
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Indeco steel shears re-worked
    April 19, 2016
    Indeco has totally redesigned its ISS steel shears. On show at the bauma stand was the ISS 30/50; the manufacturer aims to introduce the new features to the entire range in the future. “Our customers were asking us whether we could increase the speed of the steel shear, increase the clamping force and reduce the wear,” said Indeco technical specialist Alessandro Ciccolella. “We improved the cyclinder’s hydraulic line to give much more speed and we used a new, special material for the blade to increase th