Skip to main content

Doka’s stripped-back d3 tower for emerging markets

In 2015, formwork specialist Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets. At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility. “W
April 19, 2016 Read time: 2 mins
In 2015, formwork specialist 203 Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets.

At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility.

“We have reduced it to the minimum functionality to produce a very economical version of this product for emerging markets,” said Doka’s director of research and development Johann Peneder.

Doka is initially marketing d3 to projects in Southeast Asia and the Middle East with plans to roll it out to other regions in the future.

All videos

For more information on companies in this article

Related Content

  • Liebherr sets new record for financial results
    April 7, 2020
    Liebherr has set a new record for its financial results in 2019.
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    February 13, 2013
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • Major bridge construction on Denmark's road project
    April 20, 2012
    Doka is playing a leading role in Denmark’s first ever public private partnership roadbuilding project. The 26km long, four-lane M51, 15km from the German border, will link Kliplev and Sønderborg in southern Jutland. And Doka will be the sole provider offormwork for the concrete used in erecting the motorway’s 72 bridges and crossings. The M51 is using 9000m² of the extremely adaptable Large-area formwork Top 50, and more than 4,750 basic frames of the heavyduty Load-bearing tower Staxo 100 system.