Skip to main content

Doka’s stripped-back d3 tower for emerging markets

In 2015, formwork specialist Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets. At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility. “W
April 19, 2016 Read time: 2 mins
In 2015, formwork specialist 203 Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets.

At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility.

“We have reduced it to the minimum functionality to produce a very economical version of this product for emerging markets,” said Doka’s director of research and development Johann Peneder.

Doka is initially marketing d3 to projects in Southeast Asia and the Middle East with plans to roll it out to other regions in the future.

All videos

For more information on companies in this article

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Doka delivers on Kuwait's Nawaseeb Road
    May 11, 2021
    Along the 37km RA217 section of Nawaseeb Road poroject, Doka helped deliver Kuwait’s first in-situ cantilever bridge work.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade