Skip to main content

Doka’s stripped-back d3 tower for emerging markets

In 2015, formwork specialist Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets. At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility. “W
April 19, 2016 Read time: 2 mins
In 2015, formwork specialist 203 Doka’s turnover passed the euro1billion mark – and over half of that came from outside Europe. It is perhaps not surprising that it is devoting some of the 200,000 hours a year it spends on R&D to adapting existing products for new global markets.

At bauma 2016, Doka is showcasing one such product: the Load-bearing tower d3, aimed at emerging markets. It has designed the d3 for heavy loads, high shoring heights, and many different configurations to provide flexibility.

“We have reduced it to the minimum functionality to produce a very economical version of this product for emerging markets,” said Doka’s director of research and development Johann Peneder.

Doka is initially marketing d3 to projects in Southeast Asia and the Middle East with plans to roll it out to other regions in the future.

All videos

For more information on companies in this article

Related Content

  • Günter Papenburg’s versatile asphalt plants
    January 6, 2017
    Günter Papenburg is now offering a range of highly versatile and mobile asphalt batching plants. These plants are designed for ease of transportation as they come in standard shipping containers and can be set up in just 1-2 weeks on site according to the firm. The firm’s Rapid plants are available in two basic variants, with outputs of 140tonnes/hour and 180tonnes/hour. Customers can also specify from a range of options including hot storage or different hopper configurations. The plants can be supplied wi
  • The bridge to reduced traffic
    February 28, 2012
    In Zaporozhye, the industrial metropolis in Ukraine's south-east, a multi-lane cable stayed bridge is being built alongside an older viaduct. On completion, this large-scale infrastructure project will massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at this major river crossing.
  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity