Skip to main content

Doka’s DokaTruss table and Super Climber SCP on show at Conexpo 2014

Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show. A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently. In the Comp
January 17, 2014 Read time: 2 mins
DokaTruss table and Super Climber SCP
203 Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show.

A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently.

In the Component Corner of the Doka booth, visitors can get an insight into the company’s high quality standards and discover what the firm claims will soon be in heavy use on job sites around the world.

With projects like Tower 4 of the World Trade Center in New York, Colorado River Bridge in Texas or the Second Midtown Tunnel down the Elizabeth River in Virginia, Doka says it has demonstrated its expertise across the United States. In addition to its strong presence in the North American market, the company says its experience on construction projects worldwide has aided new product development and provides the basis for innovations – in both systems and services. “What Doka has to offer goes far beyond mere products. We work closely with our customers to devise individualised solutions for every construction project,” says Doka Group chairman Josef Kurzmann.








%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12781 0 oLinkExternal www.Doka.com Doka web false /EasySiteWeb/GatewayLink.aspx?alId=12781 false false%>

For more information on companies in this article

Related Content

  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    February 13, 2013
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity