Skip to main content

Doka’s Concremote gives exact measurement for accurate control

Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
January 6, 2017 Read time: 2 mins
Accurate strength measurement from Doka
203 Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations.

The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be measured at any place on the construction. In addition, the continuous registration of the temperature at every point in time provides information on increase in weighted maturity and therefore directly on the development of the strength.

Concremote has two different types of sensor. The cableless slab sensor is used on Concrete in Place (CIP) concrete floor slabs, in cut-and-cover tunnel construction and at bridge-building sites. Cable sensors are particularly suitable for use on wall and column formwork and in crane-climbed and automatic climbing projects, at bridge- and tunnel-building sites and on mass concrete structures.

Cable sensors can be fitted with accessories that allow up to three different measuring points. The Concremote wall sensing element lets users integrate a measuring point into the formwork, permanently and re-useably. This makes it possible to reposition the sensors together with the formwork, without any extra work.

The Concremote sensors regularly measure the temperature development of the fresh concrete and transmit the data to the Concremote computing centre. Strength development of the concrete is calculated by reference to the values from the previously effected calibration measurement and the information is sent back to the site in real-time.

Once the fresh concrete has been struck off, the slab sensor can simply be placed in the concrete. The sensors' long battery life and rugged design mean that only minimal maintenance is needed.

The mobile web application lets users access the data on the strength development of their concrete at any time, from anywhere – on, for example, notebooks, tablets and smartphones.

Apart from Concremote, Doka is presenting its product enhancement Concremote plug.In. The systems integrated directly into the floor system to determines the correct stripping time.

For more information on companies in this article

Related Content

  • Challenging viaduct construction
    March 2, 2012
    TRAFFIC VOLUMES on Gran Canaria, the third largest of the Canary Islands, have been swelling rapidly in recent years, not least because of the boom in tourism. Among the routes most affected is the 32km long northern motorway GC-2 between Las Palmas and Agaëte, which has reached the limits of its capacity.
  • Paschal’s high-performance NeoR formwork is no lightweight solution
    October 26, 2022
    Less weight and better performance levels are the prime features of Paschal’s new NeoR formwork system for smaller projects.
  • A flexible approach to concrete testing
    February 20, 2012
    One of the world's most versatile building materials is subject to a variety of tests to make sure it is fit for purpose. Patrick Smith reports
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda