Skip to main content

Doka’s Concremote gives exact measurement for accurate control

Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
January 6, 2017 Read time: 2 mins
Accurate strength measurement from Doka
203 Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations.

The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be measured at any place on the construction. In addition, the continuous registration of the temperature at every point in time provides information on increase in weighted maturity and therefore directly on the development of the strength.

Concremote has two different types of sensor. The cableless slab sensor is used on Concrete in Place (CIP) concrete floor slabs, in cut-and-cover tunnel construction and at bridge-building sites. Cable sensors are particularly suitable for use on wall and column formwork and in crane-climbed and automatic climbing projects, at bridge- and tunnel-building sites and on mass concrete structures.

Cable sensors can be fitted with accessories that allow up to three different measuring points. The Concremote wall sensing element lets users integrate a measuring point into the formwork, permanently and re-useably. This makes it possible to reposition the sensors together with the formwork, without any extra work.

The Concremote sensors regularly measure the temperature development of the fresh concrete and transmit the data to the Concremote computing centre. Strength development of the concrete is calculated by reference to the values from the previously effected calibration measurement and the information is sent back to the site in real-time.

Once the fresh concrete has been struck off, the slab sensor can simply be placed in the concrete. The sensors' long battery life and rugged design mean that only minimal maintenance is needed.

The mobile web application lets users access the data on the strength development of their concrete at any time, from anywhere – on, for example, notebooks, tablets and smartphones.

Apart from Concremote, Doka is presenting its product enhancement Concremote plug.In. The systems integrated directly into the floor system to determines the correct stripping time.

For more information on companies in this article

Related Content

  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f
  • Wolffkran leads the pack
    December 10, 2024
    At present, the two WOLFF 7534.16 Clear cranes are drawing a lot of attention near Horb in Germany’s Neckar Valley
  • Doka handles Austria tunnel upgrade
    January 4, 2017
    A key section of the busy A12 route in Austria’s Tyrol area has been refurbished with help from formwork specialist Doka. The company devised a formwork traveller featuring steel panels so as to help build a new inner shell for the twin-tube Senftenberg Gallery tunnel. The job involved 36 pouring sections for work on the first tube followed by a break to accommodate winter tourist travel. After some minor modifications the same formwork traveller was then re-used for another pouring a further 36 sections on
  • Huesker: the case for geosynthetics
    April 19, 2022
    Huesker, a global manufacturer of geosynthetics and technical textiles, explains how incorporating geosynthetic material can boost a project’s environmental credentials*.