Skip to main content

Doka’s Concremote gives exact measurement for accurate control

Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
January 6, 2017 Read time: 2 mins
Accurate strength measurement from Doka
203 Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations.

The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be measured at any place on the construction. In addition, the continuous registration of the temperature at every point in time provides information on increase in weighted maturity and therefore directly on the development of the strength.

Concremote has two different types of sensor. The cableless slab sensor is used on Concrete in Place (CIP) concrete floor slabs, in cut-and-cover tunnel construction and at bridge-building sites. Cable sensors are particularly suitable for use on wall and column formwork and in crane-climbed and automatic climbing projects, at bridge- and tunnel-building sites and on mass concrete structures.

Cable sensors can be fitted with accessories that allow up to three different measuring points. The Concremote wall sensing element lets users integrate a measuring point into the formwork, permanently and re-useably. This makes it possible to reposition the sensors together with the formwork, without any extra work.

The Concremote sensors regularly measure the temperature development of the fresh concrete and transmit the data to the Concremote computing centre. Strength development of the concrete is calculated by reference to the values from the previously effected calibration measurement and the information is sent back to the site in real-time.

Once the fresh concrete has been struck off, the slab sensor can simply be placed in the concrete. The sensors' long battery life and rugged design mean that only minimal maintenance is needed.

The mobile web application lets users access the data on the strength development of their concrete at any time, from anywhere – on, for example, notebooks, tablets and smartphones.

Apart from Concremote, Doka is presenting its product enhancement Concremote plug.In. The systems integrated directly into the floor system to determines the correct stripping time.

For more information on companies in this article

Related Content

  • The AI-based SBM REMAX 600 mobile impact crusher
    October 26, 2022
    SBM Mineral Processing (SBM) has developed the REMAX 600 track-mobile impact crusher as a ‘technological platform’ for an AI (artificial intelligence)-based, fully automatic production monitoring and control system.
  • Innovations in earthmoving
    May 13, 2024
    New innovations for the crawler excavator market will boost productivity as well as sustainability – Mike Woof writes
  • Weigh in motion systems aid safety, reduce costs
    February 14, 2012
    Advanced weigh-in-motion (WIM) systems can offer a quick payback time
  • New tests for modified bitumens and mixes with RAP
    December 19, 2014
    This month we learn about a new test which is helping to predict the performance of asphalt mixtures containing recycled materials and modifiers, and we showcase some of the new testing equipment recently launched - writes Kristina Smith Researchers in the US have come up with a new test to help owners and contractors better predict the performance of their roads. “The problem is that the current tests cannot determine the performance of new materials,” said Dr Haleh Azari, manager of the AASHTO Advanced P