Skip to main content

Doka puts the ‘Y’ in Turkey

The 600m cable-stayed Kömürhan Bridge rises around 165m over eastern Turkey’s Karakaya Dam Lake and is part of the Malatya-Elazig State Highway. The bridge is the fourth single-pylon cable-stayed bridge in the world and is due to open in July.
July 8, 2020 Read time: 2 mins
Doka Turkey saw its main challenge as being the Kömürhan Bridge’s pylon

It is part of a 5.2km four-lane highway that includes a 120m viaduct and a 2.4km tunnel, providing passage to the Karakaya Dam a few kilometres to the south. The bridge is being built beside an existing bridge that will, along with the its curved roads, remain open.

Standing at 168.5m, the ‘Y’ shaped reinforced concrete tower is the centrepiece of the bridge across the Fırat River. The deck cross-section will be orthotropic steel while the superstructure will be connected to the pylon with 42 cables.

Doka Turkey, which is working for the Doğuş and Gülsan joint venture main contractor, saw its main challenge as being the pylon, given its unusual shape. Doka’s Automatic Climbing Formwork SKE 50 was used on the upper single core column of the pylon, while a specially adapted double set was used on the lower half with bespoke solutions created at junction points to maintain the highest standards of quality and safety.

Large-area formwork Top 50 was used for the pylon with Doka D2/D3 and Load-bearing Towers Staxo 100 shoring systems for the approaching viaduct. While a tower and mobile crane were used for the pylon and viaduct respectively, the formwork solution was otherwise self-sufficient and delivered its portion of the project safely, on time and on budget.

For more information on companies in this article

Related Content

  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
  • Climbing in Corpus Christi
    September 17, 2020
    The challenge for Doka on the new Harbor Bridge in Texas was to use the same formwork for each pylon despite each pylon’s different geometry.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req