Doka pushes into Asia and Middle East with load bearing tower d3

With the Load-bearing tower d3, Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction. It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposi
January 6, 2017 Read time: 2 mins
Accurate strength measurement from Doka
With the Load-bearing tower d3, 203 Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction.

It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposition is possible with the help of wheels. Height can be adjusted as hot dip galvanised frames are available in 0.9m 1.2m and 1.8m height. Height adjustment is possible to the last millimetre.

Also, the Doka UniKit shoring system was developed for the Latin American markets. Doka UniKit is the ideal modular system for transferring heavy loads. With the modular system grid, large-volume load-bearing structures are produced quickly and easily. It allows for a variety of uses such as infrastructure and power plant builds.
All videos

For more information on companies in this article

Related Content

  • Patents pending on two of CDE’s many improvements to its Evowash plant
    April 19, 2013
    Materials washing specialist CDE is displaying three updated machines at bauma 2013 – the Evowash, the M2500 and the Agg Max 83R. All three machines have benefitted from CDE’s in-house ‘Worldbeater’ programme, which sees teams of staff pitted against each other to come up with new ideas.
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Major advances are being seen in aggregate production technologies
    June 28, 2013
    Recent exhibitions have been launch venues for key developments in aggregate production technologies - Mike Woof reports Efficient production of aggregates is crucial for maintaining cost-effectiveness and also lowering material costs. With contractors owning many of their own quarry operations, these firms understand the benefits of reducing materials costs for their road construction projects. Major developments in the equipment for crushing, screening and washing aggregates are now coming to market and e
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh