Skip to main content

Doka eyes Grand Paris project

A huge tunnel formwork takes centre stage on Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro. “In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla. The tunnel formwork, SL1, used to form the crown of a tunnel, has recently b
April 25, 2018 Read time: 2 mins
A huge tunnel formwork takes centre stage on 203 Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro.


“In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla.

The tunnel formwork, SL1, used to form the crown of a tunnel, has recently been modified so that the face-forming element is steel rather than timber. “This means that it is more durable and therefore for a long tunnel, it makes it cheaper” says Castilla. “The second advantage is that the whole thing can be rented.”

Also on display was Doka’s STAXO 100 load-bearing tower which also boasted a modification. It now includes aluminium beams to transfer load from the structure to the tower where previously timber beams were used. This allows a capacity of the tower of 10 tonnes per leg with lightweight beams that can be assembled by hand.  Doka has already secured projects on the Grand Paris programme with this product, says Castilla.

Doka’s remote concrete monitoring technology, Concremote, is also new to the French market, says Castilla, and is being deployed in several projects for the first time now. Concremote measures the strength of the concrete in real time, through monitoring the heat, which means that formwork can be struck as soon as the required strength is reached, increasing productivity and ensuring quality and safety.

For more information on companies in this article

Related Content

  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Doka puts the ‘Y’ in Turkey
    July 8, 2020
    The 600m cable-stayed Kömürhan Bridge rises around 165m over eastern Turkey’s Karakaya Dam Lake and is part of the Malatya-Elazig State Highway. The bridge is the fourth single-pylon cable-stayed bridge in the world and is due to open in July.
  • Bridging the River Tisza
    February 7, 2012
    The Hungarian government has been investing heavily in extending and improving the country's motorway and trunk road network.