Skip to main content

Doka eyes Grand Paris project

A huge tunnel formwork takes centre stage on Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro. “In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla. The tunnel formwork, SL1, used to form the crown of a tunnel, has recently b
April 25, 2018 Read time: 2 mins
A huge tunnel formwork takes centre stage on 203 Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro.


“In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla.

The tunnel formwork, SL1, used to form the crown of a tunnel, has recently been modified so that the face-forming element is steel rather than timber. “This means that it is more durable and therefore for a long tunnel, it makes it cheaper” says Castilla. “The second advantage is that the whole thing can be rented.”

Also on display was Doka’s STAXO 100 load-bearing tower which also boasted a modification. It now includes aluminium beams to transfer load from the structure to the tower where previously timber beams were used. This allows a capacity of the tower of 10 tonnes per leg with lightweight beams that can be assembled by hand.  Doka has already secured projects on the Grand Paris programme with this product, says Castilla.

Doka’s remote concrete monitoring technology, Concremote, is also new to the French market, says Castilla, and is being deployed in several projects for the first time now. Concremote measures the strength of the concrete in real time, through monitoring the heat, which means that formwork can be struck as soon as the required strength is reached, increasing productivity and ensuring quality and safety.

For more information on companies in this article

Related Content

  • Intermat Middle East positions itself for growth
    October 17, 2012
    As the United Arab Emirates gears up to invest more than US $4.6 billion (UAE Dirham 17 billion) in its nationwide road network in the next few years, the second annual INTERMAT Middle East show has taken place in Abu Dhabi with suppliers like AAA Cranes, Miller UK, Kanoo, Liebherr, Sennebogen, WireCo World, Erkat, Terex Finlay, Atlas Copco, , ELSA SRL, Robit Rock Tools, Ramtec Robi, Scheuerle Fahrzeugfabrik, T.G.S – The Grab Specialist, BV Beco, Techking Tires, Blastrac, SK Solutions, Xcentric Internationa
  • Manitowoc showcases speedy winch and internal lift for tower cranes
    April 24, 2018
    Manitowoc is showcasing two new products on its stand at Intermat: a lift for tower crane operators, the Potain Cab-In, and its 75 High Performance Lifting (HPL) winch for tower cranes. Manitowoc has developed the Potain Cab-In to meet changing regulations in France that say a lift must be used on tower cranes for heights of more than 50m from January 2019. Other countries are likely to follow suit, says Jerome Chanel, vice president of services for Manitowoc. Manitowoc says that its lift is a first b
  • Tertu T18 barriers in Chile’s ski resort Club Andino Punta Arenas
    October 9, 2018
    Wood and steel road restraint systems from French manufacturer Tertu are now lining the route up to the Chilean ski resort Club Andino Punta Arenas The Chilean Ministry of Public Works chose the Tertu steel-backed timber guardrails for the road to the resort, not far from the city of Punta Arenas, located in the most austral region of Chile. Apart from enhancing the natural beauty of many areas such as a ski resort, Tertu says that its barriers are environmentally-friendly. They contribute to reduce the i
  • BIM pilot project for Peri in Germany
    April 12, 2016
    Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr