Skip to main content

Doka eyes Grand Paris project

A huge tunnel formwork takes centre stage on Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro. “In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla. The tunnel formwork, SL1, used to form the crown of a tunnel, has recently b
April 25, 2018 Read time: 2 mins
A huge tunnel formwork takes centre stage on 203 Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro.


“In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla.

The tunnel formwork, SL1, used to form the crown of a tunnel, has recently been modified so that the face-forming element is steel rather than timber. “This means that it is more durable and therefore for a long tunnel, it makes it cheaper” says Castilla. “The second advantage is that the whole thing can be rented.”

Also on display was Doka’s STAXO 100 load-bearing tower which also boasted a modification. It now includes aluminium beams to transfer load from the structure to the tower where previously timber beams were used. This allows a capacity of the tower of 10 tonnes per leg with lightweight beams that can be assembled by hand.  Doka has already secured projects on the Grand Paris programme with this product, says Castilla.

Doka’s remote concrete monitoring technology, Concremote, is also new to the French market, says Castilla, and is being deployed in several projects for the first time now. Concremote measures the strength of the concrete in real time, through monitoring the heat, which means that formwork can be struck as soon as the required strength is reached, increasing productivity and ensuring quality and safety.

For more information on companies in this article

Related Content

  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Paschal’s high-performance NeoR formwork is no lightweight solution
    October 26, 2022
    Less weight and better performance levels are the prime features of Paschal’s new NeoR formwork system for smaller projects.
  • Aggregate Industries opens second Manchester concrete plant
    September 12, 2019
    Aggregate Industries has opened its second ready mix concrete plant in Greater Manchester, England. The company says the move has been made to cater to rapidly growing demand in the area. The new high-capacity site – located just off the M56 in Wythenshawe – is situated between Manchester city centre and Manchester Airport. Aggregates Industries says both areas are currently undergoing a high volume of significant improvement works that require an extensive amount of concrete, including the constructi