Skip to main content

Digital Twins Generate Real-World ROI

Digital Twins Are Going Mainstream in the Transportation Industry
June 1, 2022 Read time: 2 mins

 

It’s a common knowledge that road infrastructure is aging. Many bridges and roads around the world are in poor condition due to age, wear and tear, and environmental factors, requiring repair or even replacement. To make our roads and bridges safer, federal, state, and local governments need to prioritize strategic investments that are dedicated to improving and preserving roadway conditions to increase public safety on the system in place, as well as plan for the roadways of the future.

To do their job better and faster, they need innovative technologies and processes. So, many of them are adopting digital twins. With digital delivery, projects are delivered using digital models, data, and supporting field tools for roadway design, structural design, and construction. Digital delivery incorporates streamlined processes to manage asset information as it changes through project development. With this delivery method, it’s easier to review the design intent and develop high‐resolution 3D design visuals, providing improved design quality. It can make a significant impact on reducing project cost over‐runs and the 3D design enables designers to test what-if scenarios to refine constructability and optimize project cost.

Bentley ebookDigital delivery improves design efficiency and enables contractors to benefit from a more complete representation of the design intent delivered in a more directly usable format. Therefore, it enables enhanced construction planning and less time to extract information. Lastly, digital delivery improves as-built records, saving valuable time. Instead of marking up PDF plans, contractors will collect digital as‐built records.

Learn about the benefits of digital twins and digital delivery throughout the asset lifecycle from planning, design, construction and into operations through real-world use cases that demonstrate how users around the world are leveraging digital twins to synchronize work, gain greater visibility, and make sense of the right data at the right time across the lifecycle of assets.

Download the ebook

Content produced in association with Bentley Systems

For more information on companies in this article

Related Content

  • Topcon: A revolution in construction technology’s coming
    July 7, 2021
    The construction equipment industry is at a turning point. Topcon’s senior leaders believe that we are about to see a huge surge in the adoption of new construction technologies. The time is ripe as a new, younger and more tech-savvy generation comes to the fore. Governments could save billions, and where does the smartphone fit in?
  • Infrastructure stays strong on the road to recovery
    July 1, 2021
    After more than a year of uncertainty, the road industry is coming back stronger than ever before thanks to new ways of working and increased investment – because building new infrastructure lays the foundation for a more resilient and economically robust world.
  • Norway to use Trimble technology
    January 13, 2023
    Norway is to use Trimble software technology.
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.