Skip to main content

Deeper but safer for trench shoring solutions from ThyssenKrupp’s e+s XL Carriage

ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution. The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects. The maximum width of the end-supported shoring system is now 18m. ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least be
April 24, 2018 Read time: 2 mins
ThyssenKrupp’s e+s XL carriage, an end-supported shoring system

8765 ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution.

The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects.

The maximum width of the end-supported shoring system is now 18m.

ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least because of the crane assistance needed for the system members.

The carriage absorbs both compressive forces from the sides of the shoring as well as loads from the end face. Up to now, the forces have been transferred to separate components -  the carriage and shoring struts.

The advantage is that only the carriage is needed and no other components are necessary, allowing faster and more efficient installation.

The second new product in the range is a large U-type carriage car. This is used for large shoring widths of 10m in trenches that can be 6m deep or more … or where there are high loading requirements.

For more information on companies in this article

Related Content

  • Cost-effective innovative backfill recycling
    February 29, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams which
  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams
  • Machine control technology round table discussion with Leica Geosystems, Topcon and Trimble
    January 4, 2022
    In this, the first in a series of top-level roundtable discussions led by World Highways, editor Mike Woof and editorial director Geoff Hadwick talk machine control technology with three world-class experts from Leica Geosystems, part of Hexagon, Topcon and Trimble. Find out what these key opinion leaders are thinking on six vitally important topics. Let them help you stay ahead of the game.
  • Wolffkran leads the pack
    December 10, 2024
    At present, the two WOLFF 7534.16 Clear cranes are drawing a lot of attention near Horb in Germany’s Neckar Valley