Skip to main content

Deeper but safer for trench shoring solutions from ThyssenKrupp’s e+s XL Carriage

ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution. The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects. The maximum width of the end-supported shoring system is now 18m. ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least be
April 24, 2018 Read time: 2 mins
ThyssenKrupp’s e+s XL carriage, an end-supported shoring system

8765 ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution.

The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects.

The maximum width of the end-supported shoring system is now 18m.

ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least because of the crane assistance needed for the system members.

The carriage absorbs both compressive forces from the sides of the shoring as well as loads from the end face. Up to now, the forces have been transferred to separate components -  the carriage and shoring struts.

The advantage is that only the carriage is needed and no other components are necessary, allowing faster and more efficient installation.

The second new product in the range is a large U-type carriage car. This is used for large shoring widths of 10m in trenches that can be 6m deep or more … or where there are high loading requirements.

For more information on companies in this article

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a
  • Runway resurfacing in Brussels
    April 2, 2021
    Years of heavy use meant that runway 25 at Brussels Airport required attention, with a full resurfacing needed. Smooth runways are vital for large international airports as they optimise safety and reduce wear and tear on expensive aircraft, in addition to boosting comfort for airline crews and passengers.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap