Skip to main content

Deeper but safer for trench shoring solutions from ThyssenKrupp’s e+s XL Carriage

ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution. The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects. The maximum width of the end-supported shoring system is now 18m. ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least be
April 24, 2018 Read time: 2 mins
ThyssenKrupp’s e+s XL carriage, an end-supported shoring system

8765 ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution.

The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects.

The maximum width of the end-supported shoring system is now 18m.

ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least because of the crane assistance needed for the system members.

The carriage absorbs both compressive forces from the sides of the shoring as well as loads from the end face. Up to now, the forces have been transferred to separate components -  the carriage and shoring struts.

The advantage is that only the carriage is needed and no other components are necessary, allowing faster and more efficient installation.

The second new product in the range is a large U-type carriage car. This is used for large shoring widths of 10m in trenches that can be 6m deep or more … or where there are high loading requirements.

For more information on companies in this article

Related Content

  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Innovation abounds at the smaller end of the compaction equipment sector
    August 22, 2013
    New machines are now being offered at the compact end of the asphalt compaction market - Mike Woof reports Manufacturers have developed an array of new machines and solutions for the compact end of the asphalt compactor market segment. These units have been designed to meet the latest regulations for Europe and the US, with low emission engines that are also more economical on fuel. But as these machines are made in large volumes, the market for smaller asphalt compactors sees fierce rivalry between fi
  • Loading and hauling machine improvements will boost quarry production
    July 4, 2014
    Major advances are being seen in the market for loading and hauling machines, with manufacturers developing new solutions for the quarry segment in particular- Mike Woof writes Wheeled loaders and rigid chassis dump trucks are key movers in many quarry operations. New develop-ments have seen the introduction of several new models from key players.