Skip to main content

Danfoss offers sophisticated programming tool

Danfoss Power Solutions is introducing version 7.0 of PLUS+1 GUIDE, an industry-proven graphical programming environment. This is said to offer new features and options that increase developer productivity and support functional safety standard IEC 61508-3, version 7.0 of PLUS+1 GUIDE (Graphical User Integrated Development Environment). The firm says that this offers its customers lower development costs, easier machine certification and reduced time to market. New features and options include the capabilit
January 17, 2014 Read time: 2 mins
Danfoss develops smart programming technology
1434 Danfoss Power Solutions is introducing version 7.0 of Plus+1 GUIDE, an industry-proven graphical programming environment. This is said to offer new features and options that increase developer productivity and support functional safety standard IEC 61508-3, version 7.0 of Plus+1 GUIDE (Graphical User Integrated Development Environment). The firm says that this offers its customers lower development costs, easier machine certification and reduced time to market. New features and options include the capability to import and export display screens and rescale screens, an optional GUIDE-to-Simulink functionality enabling the export of GUIDE code to Matlab Simulink S-Function for use in model-based development. It also offers an optional quality assurance tool consisting of a GUIDE test tool, comparison of graphical code and version control.

Version 7.0 of GUIDE enables developers to import and export entire screens and screen library subsets in the GUIDE screen editor, allowing much faster development of screens. Support of the scalable vector graphic (SVG) graphic data format permits automatic rescaling of available screens and easy reuse of available screens and graphics.

Porting screens to different display models, screen resolutions and screen sizes can be performed much faster with Plus+1 GUIDE 7.0. Content is stretched to fit the screen, and only minimal manual work is required as button positions and layout may vary.

The optional GUIDE-to-Simulink feature enables any GUIDE page to be exported with one click to a Simulink S-function for use in model-based development. This capability eliminates the need to rewrite and maintain code while ensuring that code is identical from one tool chain to the other.

The optional quality assurance tool contains the GUIDE test tool, a comparison of graphical code feature and version control tools. Available as one package, these features save time and cost during development and the creation of documentation required for certification.

Also available is an optional beta quality assurance tool including debugger and dependency tools. Capable of stepping from one component to the next and displaying data values, the debug tool is a user-friendly feature that saves time during testing and error tracing. The GUIDE dependency view provides a graphical indication of project code that is impacted by code changes, enabling retesting to be limited to affected functions.

Version 7.0 of Plus+1 GUIDE will be released for Windows 8 in addition to Windows XP and Windows 7.







%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 45285 0 oLinkExternal www.Danfoss.com Danfoss web false /EasySiteWeb/GatewayLink.aspx?alId=45285 false false%>

For more information on companies in this article

Related Content

  • Topcon’s new Enterprise Solutions workflow management system controls all jobs
    March 7, 2014
    Topcon Positioning Group has released a new workflow management system designed to connect all of a contractor’s sites, data, crews and equipment. Unveiled at Conexpo 2014 this week, Topcon Enterprise Solutions offers constant communication, data sharing, scheduling, updating, support activities and accurate productivity data in real-time, no matter where the job or office is located.
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Dynapac is offering new pavers to meet future emissions requirements
    January 6, 2017
    Dynapac continues to innovate with its paver range, following from previous developments in 2010 and 2011. The firm says it is now improving the operator´s environment and transport sizes, as well as gearing up to meeting future exhaust emission regulations. The firm introduced six new tracked asphalt pavers with paving widths of 2-14m. Of these, the four sophisticated PLC-controlled pavers SD2500 C / SD2500 CS / SD2550 C / SD2550 CS are designed to meet the needs of contractors, communities and rental comp
  • Dynapac is offering new pavers to meet future emissions requirements
    April 12, 2012
    Dynapac continues to innovate with its paver range, following from previous developments in 2010 and 2011. The firm says it is now improving the operator´s environment and transport sizes, as well as gearing up to meeting future exhaust emission regulations. The firm introduced six new tracked asphalt pavers with paving widths of 2-14m. Of these, the four sophisticated PLC-controlled pavers SD2500 C / SD2500 CS / SD2550 C / SD2550 CS are designed to meet the needs of contractors, communities and rental comp