Skip to main content

Cycling success

The new Barclays Cycle Superhighway scheme set up by Transport for London is benefiting from the latest system from Rediweld Traffic Products. Special RediPave Islands have now been installed, meeting a tight deadline and causing minimum traffic disruption. These splitter islands now define the cycle route and provide the cyclist with protection at a busy junction by Stockwell Tube. RediPave is a modular System made from recycled rubber and requiring no excavation.
February 7, 2012 Read time: 1 min
Cycling safety in UK capital London is boosted due to the installation of new technology from Rediweld
The new 2386 Barclays Cycle Superhighway scheme set up by 2387 Transport for London is benefiting from the latest system from 2385 Rediweld Traffic Products. Special RediPave Islands have now been installed, meeting a tight deadline and causing minimum traffic disruption. These splitter islands now define the cycle route and provide the cyclist with protection at a busy junction by Stockwell Tube. RediPave is a modular System made from recycled rubber and requiring no excavation.

For more information on companies in this article

Related Content

  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • VIDEO: Cycle parking at the office is getting easier
    September 7, 2015
    Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas. And many commuting cyclists are grateful for it, too. But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory? That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.