Skip to main content

Cycling obstacles

Four cyclists in Australia found out to their cost that colliding with a dead animal can prove calamitous. The riders were cycling in a group with their club near to Shepparton in Victoria State when they hit a dead kangaroo in the roadway. Some of the riders in the group were able to swerve around the unfortunate creature but others were unable to avoid it, with three suffering injuries that required them to be hospitalised. It is thought that the kangaroo had been struck by a vehicle shortly beforehand. T
August 23, 2016 Read time: 1 min
Four cyclists in Australia found out to their cost that colliding with a dead animal can prove calamitous. The riders were cycling in a group with their club near to Shepparton in Victoria State when they hit a dead kangaroo in the roadway. Some of the riders in the group were able to swerve around the unfortunate creature but others were unable to avoid it, with three suffering injuries that required them to be hospitalised. It is thought that the kangaroo had been struck by a vehicle shortly beforehand. This roadkill vs cyclists incident bears similarities to one in Florida, when a group of six cyclists on a training run skidded on what was left of a dead alligator lying in the roadway.

Related Content

  • Pay attention to The Ray, urges WheelRight’s John Catling
    July 17, 2017
    Development of the connected and sustainable highways is moving quickly in the US and the Far East but progress in Europe is much less impressive. One example of a connected highway that offers an interesting model for European transport planners and policymakers is The Ray, a 29km stretch of Interstate 85 in the state of Georgia. Originally established by a charitable foundation, The Ray offers an inspiring vision of a sustainable highway, even for the near future. Drivers crossing the state line from Ala
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • New Zealand's bridges survive earthquake
    February 7, 2012
    How is it that New Zealand's recent large and destructive earthquake did so little damage to the bridges in the quake zone? Mary Searle investigates. The magnitude 7.1 earthquake that hit the Canterbury region in New Zealand at 4.35am on Saturday, 4 September was similar in size to the quake that shook Haiti in January. However, the damage in Canterbury was minimal in comparison. A key contributor to this was New Zealand's preparedness for such an event. Positioned on a major fault line, New Zealand has ear
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac