Skip to main content

Cummins achieves stage V certification with B6.7 and L9 engines

Cummins has announced that its latest B6.7 and L9 engines are fully EU Stage V emissions certified and in full production at its Darlington engine plant in the UK. “The latest emissions compliant specification has resulted in higher power and torque in a smaller, lighter overall package that has become cheaper to run,” said Eric Neal, executive director of Cummins off-highway business. And, he added, “Cummins’ ability to tailor engine power and torque curves and make full use of our in-house equipment such
April 24, 2018 Read time: 2 mins
Cummins B6.7 and L9 engines are EU Stage V emissions certified

196 Cummins has announced that its latest B6.7 and L9 engines are fully EU Stage V emissions certified and in full production at its Darlington engine plant in the UK.

“The latest emissions compliant specification has resulted in higher power and torque in a smaller, lighter overall package that has become cheaper to run,” said Eric Neal, executive director of Cummins off-highway business.

And, he added, “Cummins’ ability to tailor engine power and torque curves and make full use of our in-house equipment such as turbochargers and exhaust after-treatment packaging, is enabling OEM’s to be more competitive.”

Top rated power for the B6.7 has increased to 243kW, with a peak torque of 1375Nm representing an increase of 30% over that achieved at EU Stage IV levels. The larger L9 engine has increased from 291kW up to 321kW, together with a 13% increase in peak torque, to achieve 1846Nm.

“The higher capability of these engines is delivering down-sizing opportunities for our equipment manufacturers,” he said.

For more information on companies in this article

Related Content

  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • Sandvik renewed and buoyant in China
    November 30, 2018
    Just five months after becoming Sandvik Mobile Crushers & Screens’ Chinese market dealer, Pota Environment (Shanghai) has already sold 20 units - and is forecasting a strong sales year in 2019. Three jaw-cone-screener plant trains have been bought by Xindadi, a Beijing-based aggregates processing company, who are using the nine machines to process gneiss into 0-8mm and 8-28mm final products for highways and other infrastructure works’ customers in and around China’s capital. “The customer is able to p
  • New emissions proposals - lean, clean green construction machines – but at what cost?
    October 3, 2014
    The European Commission has published proposals setting strict limits on exhaust emissions for off-highway machinery. This proposal has major implications for the construction machinery sector and would make the EU exhaust emissions limits the strictest in the world. There has been a call for swift reading of the regulation in Parliament and Council. This long-anticipated proposal for a revision of the directive 97/68/EC, covers exhaust emissions reduction for engines installed in non-road mobile machinery.
  • Bell showcasing new generation B30E ADT at INTERMAT 2015
    January 28, 2015
    Bell Equipment is showcasing its new generation Bell B30E ADT with Stage IV / Tier 4f compliant engine. Combining latest engine and drivetrain technology with specific Bell innovations, the 28-tonne B30E and 24-tonne B25E ADTs are said to redefine the standards in productivity, safety and drivers’ comfort for earthmoving and smaller quarrying applications.