Skip to main content

Crossing safely

The driver of a stretch limousine in the US found out that his vehicle should stay on the right side of the tracks. The long wheelbase car had been rented by teenagers, celebrating a birthday in the US state of Indiana. However when the driver attempted to cross the rail tracks, the car became stranded on top with both axles clear of the ground. The teenagers and the driver got out of the vehicle safely and attempted to warn the driver of an oncoming goods train. However the heavily laden train was unable t
September 11, 2015 Read time: 1 min
The driver of a stretch limousine in the US found out that his vehicle should stay on the right side of the tracks. The long wheelbase car had been rented by teenagers, celebrating a birthday in the US state of Indiana. However when the driver attempted to cross the rail tracks, the car became stranded on top with both axles clear of the ground. The teenagers and the driver got out of the vehicle safely and attempted to warn the driver of an oncoming goods train. However the heavily laden train was unable to stop in time, ramming into the side of the limousine and shoving it a distance up the tracks.

Related Content

  • Eurovia and Ringway implement Safe Dig areas
    March 28, 2018
    A UK contractor has revamped its training to help employees avoid damaging utilities, not to mention suffering injury or loss of life, when digging. Eurovia and Ringway have set up Safe Dig Training designed to reduce underground service strikes. Strikes can occur when the ground is disturbed through works preparations, erecting site signage and repaving or resurfacing work. The safe dig areas have been built in strategic depots across England as part of the training to assess competency following a servic
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Develop the Silk Roads, boost economic growth
    April 12, 2012
    Tony Pearce, honorary life member and former director-general of IRF Geneva, recalls the history of the Silk Roads, highlights their continued economic relevance and introduces IRF's active long-term commitment to their rehabilitation.