Skip to main content

Crossing the line

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn
October 12, 2017 Read time: 1 min

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn. The impatient cyclist managed to avoid being hit by the train by a few centimetres, although the train driver has since had to have counselling due to the incident.

Related Content

  • Winnipeg man celebrates years of road works outside his shop
    July 1, 2016
    After more than a decade of road works and repairs outside his business, one Winnipeg, Canada, resident told World Highways that enough is enough. “I’ve got no malice towards the contractors,” Gordon Partridge told World Highways. “Contractors are simply where they are told to be. It’s the city officials. The left hand doesn‘t always know what the right hand is doing.” What he has is “ambivalence and frustration at the situation”. As the health centre owner and chiropractor explains, “there’s two seas
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Road safety changes for 2022 in Europe
    January 20, 2023
    Road safety changes have been seen for 2022 in Europe.
  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o