Skip to main content

Council acts on coastal road erosion

Work has started on repairing an important road near Silloth in Cumbria, North West England to save it from coastal erosion. The scheme, on the B5300 Maryport to Silloth road, will see a 280m length of rock armour constructed to protect the sand and gravel bank on which the road runs at Castle Corner between Mawbray and Beckfoot. Costing €385,942 (£320,000), the work being carried out by Cumbria County Council’s in-house highways team follows approval from the Council’s cabinet to fund a new sea defence bui
June 24, 2013 Read time: 2 mins
Work has started on repairing an important road near Silloth in Cumbria, North West England to save it from coastal erosion.

The scheme, on the B5300 Maryport to Silloth road, will see a 280m length of rock armour constructed to protect the sand and gravel bank on which the road runs at Castle Corner between Mawbray and Beckfoot.

Costing €385,942 (£320,000), the work being carried out by Cumbria County Council’s in-house highways team follows approval from the Council’s cabinet to fund a new sea defence built from 5,000tonnes of stone in large pieces, and 2,000tonnes of smaller material.

The vulnerable area of coast targeted by the Cumbria County Council scheme has eroded by around 20m at this location in the last two years as part of the natural erosion processes in the Solway Firth. Because of the erosion getting closer to the road, temporary traffic lights have been in place since the spring to keep traffic away from the road’s seaward edge.

Related Content

  • Rebuilding better gravel roads more efficiently
    October 15, 2015
    Using a linear road crusher can rebuild gravel roads using material onsite at a fraction of the cost of conventional methods. Gravel roads are common in many rural areas in the US to provide access to temporary work sites and are also used widely in developing countries. Maintaining and repairing these roads can pose challenges and new methods may offer improvements in efficiency.
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).