Skip to main content

CONTROLS widens capabilities for asphalt testing

The CONTROLS Group is widening its array of asphalt testing technologies. New from the Group is the PAVELAB50. This has been developed by the PAVELAB SYSTEMS division and is an automatic closed loop system for the separation and extraction of bitumen, filler and aggregates asphalt samples. This uses solvents, according to ASTM D2172 and EN 12697-1. The test methods are used for measuring bitumen in hot-mixed paving mixtures and paving samples for specification acceptance, service evaluation, control and res
January 6, 2017 Read time: 2 mins
CONTROLS is now offering more sophisticated asphalt testing systems
The 2139 CONTROLS Group is widening its array of asphalt testing technologies. New from the Group is the PAVELAB50. This has been developed by the PAVELAB SYSTEMS division and is an automatic closed loop system for the separation and extraction of bitumen, filler and aggregates asphalt samples. This uses solvents, according to ASTM D2172 and EN 12697-1. The test methods are used for measuring bitumen in hot-mixed paving mixtures and paving samples for specification acceptance, service evaluation, control and research. The machine is offered in two versions, with one including an innovative balancing system. The sample can be weighted at the end of each stage and related data is recorded and used for automatic result calculation.

The latest development in bitumen testing systems match the new fully automatic penetrometer PIVOT conforming to all the main international standards. The penetration needle is lowered with high precision by a stepper motor and the starting point is detected automatically. The device is zeroed and the penetration test is automatically performed with fully user-defined parameters without any operator intervention. The penetration value is measured by a high-resolution contactless displacement transducer and recorded in a portable USB memory stick. The operator interface is a colour touchscreen with multiple functions, including the real time display of penetration/time curve.

Another new system on display is the new Rolling Thin Film Oven RTFOT, it determines the resistance to hardening under the influence of heat and air. The oven has a touch-screen color display control panel, including timer function, visual warnings and digital air flow indicator. Standard’s temperature requirements (time to reach target temperature after switch on, target temperature adjustment after samples insertion) are fulfilled and exceeded.

For more information on companies in this article

Related Content

  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • Infrastructure stays strong on the road to recovery
    July 1, 2021
    After more than a year of uncertainty, the road industry is coming back stronger than ever before thanks to new ways of working and increased investment – because building new infrastructure lays the foundation for a more resilient and economically robust world.
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.